The Dudding Hill Line (or Dudding Hill Loop) is a railway line in west and north-west London running from Acton to Cricklewood. It is roughly 4 miles (6...
24 KB (1,860 words) - 23:13, 23 April 2025
West London Light railway (NWLLR), which would make use of the Dudding Hill freight line freight corridor that runs through Cricklewood station. The NWLLR...
14 KB (1,402 words) - 00:56, 27 November 2024
West London Orbital (redirect from West London Orbital line)
combination of existing freight and passenger lines including the Dudding Hill Line, North London Line and Hounslow Loop. The route would run for approximately...
23 KB (1,819 words) - 11:46, 1 December 2024
first railway in the area was the Dudding Hill Line, opened in 1875 by the Midland Railway to connect its Midland Main Line and Cricklewood goods yard in...
12 KB (1,255 words) - 14:05, 17 September 2024
Dudding may refer to: Dudding (surname) Dudding Hill Line, a railway line in north-west London, UK Dudding Hill railway station on the Dudding Hill Line...
207 bytes (57 words) - 16:50, 19 March 2021
Heathrow and Cambridge via the Chiltern Main Line and the Dudding Hill Line to connect with the Midland Main Line at a "Cricklewood Interchange" station. Two...
19 KB (1,693 words) - 23:07, 26 September 2024
Kingsbury and Wembley, while Gladstone Park and the Dudding Hill line separates it from Dollis Hill and Church End respectively. The A406 North Circular...
25 KB (2,864 words) - 03:09, 11 April 2025
Dudding Hill railway station was a station in Neasden, London NW2 on the Dudding Hill Line. The station was opened in 1875 by the Midland Railway, originally...
3 KB (163 words) - 02:58, 4 February 2025
to include the Dudding Hill Line, the Ealing Broadway branch of the Central line and freight tracks parallel to the Midland Main Line. The proposal had...
13 KB (1,077 words) - 15:41, 19 February 2025
also run through the area. The park is situated on both sides of the Dudding Hill Line. This railway is currently only used by freight trains, but it has...
14 KB (1,674 words) - 18:12, 20 May 2025
High Speed 2 which included West London Line, North London Line, West Coast Main Line and Dudding Hill Line platforms, although this pre-dated the announcement...
32 KB (2,958 words) - 15:35, 14 May 2025
City line; between Rayners Lane and Uxbridge with the Piccadilly line; and between Harrow-on-the-Hill and Amersham with the London–Aylesbury line operated...
62 KB (5,317 words) - 14:58, 9 March 2025
London Overground (redirect from Ginger line)
to the North London line, West London line, and to two new London Overground branches, to Hounslow, and – via the Dudding Hill line – to Thameslink stations...
112 KB (9,478 words) - 15:21, 30 May 2025
Metropolitan/Bakerloo Underground line to Stanmore. An extension at the southern end of the line to Camberwell and Denmark Hill was proposed and approved in...
47 KB (4,440 words) - 12:53, 2 March 2025
constructed the Dudding Hill Line (now a freight line), which gave its new residents access to central London. However, the passenger service on the line closed...
18 KB (1,582 words) - 07:35, 2 April 2025
scheme, known as the West London Orbital envisages re-opening the Dudding Hill Line to passenger services and running trains from West Hampstead Thameslink...
12 KB (1,031 words) - 19:27, 15 May 2025
Hounslow Loop Line between Brentford and Hounslow. The scheme, known as the West London Orbital, would involve the re-opening of the Dudding Hill Line to passenger...
8 KB (723 words) - 23:45, 21 August 2024
The Midland Main Line (MML), sometimes also spelt Midland Mainline, is a major railway line from London to Sheffield in Yorkshire via the East Midlands...
67 KB (4,451 words) - 19:32, 26 May 2025
The Watford DC line is a suburban railway line from London Euston to Watford Junction in Greater London and Hertfordshire. The line is shared by services...
26 KB (2,892 words) - 06:37, 7 April 2025
Acton Central railway station (category Mildmay line stations)
Harlesden (Midland) railway station was the next stop on the line north. The Dudding Hill line is still open today, but only carries freight. Acton Central...
8 KB (647 words) - 22:30, 25 March 2025
The Chiltern Main Line is a railway line which links London (Marylebone) and Birmingham (Moor Street and Snow Hill) on a 112-mile (180 km) route via High...
53 KB (4,438 words) - 14:00, 1 March 2025
north end, just off Willesden Magistrates Court. To the west, the Dudding Hill Line and Taylors Lane Power Station separates it from Brentfield Road in...
7 KB (677 words) - 01:27, 10 February 2025
proposed an extension of the line to St Pancras, proposing use of the Dudding Hill line to access the Midland Main Line to access St Pancras. Railtrack...
32 KB (2,740 words) - 18:54, 17 December 2024
scheme, known as the West London Orbital envisages re-opening the Dudding Hill Line to passenger services and running trains from West Hampstead Thameslink...
8 KB (602 words) - 00:47, 27 November 2024
The West Coast Main Line is a major trunk railway in the United Kingdom, linking London with Glasgow. The Watford DC lines are intricately linked with...
31 KB (280 words) - 11:27, 13 September 2024
Railway (NLR) in 1853). This gave a link from the Euston main line near Primrose Hill to the docks at Poplar via Bow. In the west, the North & South...
34 KB (3,967 words) - 12:09, 15 April 2025
The London–Aylesbury line is a railway line between London Marylebone and Aylesbury, going via the Chiltern Hills; passenger trains are operated by Chiltern...
21 KB (1,738 words) - 19:50, 5 May 2024
before curving north along a short section of the Dudding Hill Line to join the West Coast Main Line. The NLL and WLL would meet at a point on the southern...
47 KB (3,384 words) - 07:02, 19 May 2025
Hammersmith tube station (District and Piccadilly lines) (redirect from Hammersmith tube station (Piccadilly & District Line))
St Pancras to Earl's Court via Cricklewood and South Acton on the Dudding Hill Line. It operated over a now disused connection between the North London...
11 KB (1,106 words) - 20:28, 29 May 2025
as Stonebridge Park. It was opened by the Midland Railway on the Dudding Hill Line on 3 August 1875, partly to service the neighbouring exclusive Craven...
7 KB (540 words) - 15:20, 14 September 2022