• The BarsoiRadhikapur branch line links Howrah–New Jalpaiguri line on Barsoi Junction railway station from Radhikapur railway station on the Bangladesh–India...
    8 KB (513 words) - 16:36, 14 April 2025
  • literates in Radhikapur was 675 (73.13% of the population over 6 years). Radhikapur railway station is on the Barsoi-Radhikapur branch line. "India-Bangladesh...
    12 KB (611 words) - 17:46, 15 February 2023
  • Thumbnail for Howrah–Nagpur–Mumbai line
    Railway's Bombay–Tannah line was extended to Callian (current Kalyan). Bhusawal station was set up in 1860 and in 1867 the GIPR branch line was extended to Nagpur...
    10 KB (759 words) - 20:55, 22 March 2025
  • Thumbnail for Howrah–Kharagpur line
    carriage and wagon overhaul. The main line is classified as a "Group A" line which can take speeds up to 160 km/h. The branch lines have speed limits within...
    13 KB (900 words) - 11:53, 27 March 2025
  • Thumbnail for Howrah–Seoraphuli–Bishnupur branch line
    Sheoraphuli–Bishnupur branch line is a railway line connecting Sheoraphuli on the Howrah–Bardhaman main line and Bishnupur. The 39-kilometre long (24 mi) railway line traverses...
    10 KB (796 words) - 11:57, 25 March 2025
  • Thumbnail for Howrah–Chennai main line
    514 km (319 mi) long northern portion of the East Coast line to Cuttack, including the branch line to Puri, was taken over by Bengal Nagpur Railway in 1902...
    13 KB (1,168 words) - 17:10, 11 January 2025
  • Thumbnail for East Coast Railway zone
    Additionally the line branching off Khurda road towards Puri was also electrified. Gradually the Cuttack-Angul line, Cuttack-Paradeep line and branch line from Jakhapura...
    10 KB (825 words) - 09:28, 17 May 2025
  • Thumbnail for Howrah–Prayagraj–Mumbai line
    which had established the Howrah–Allahabad–Delhi line, opened the Allahabad–Jabalpur branch line in June 1867. GIPR connection over the Thull Ghat reached...
    11 KB (863 words) - 07:55, 2 January 2024
  • Barsoi Junction railway station serves Barsoi town and katihar city in Katihar district in the Indian state of Bihar. It is a major and very important...
    7 KB (408 words) - 06:52, 23 March 2025
  • Thumbnail for Chittaranjan Locomotive Works
    Asansol–Tatanagar–Kharagpur line Barauni–Gorakhpur, Raxaul and Jainagar lines Barkakana–Son Nagar line Barsoi–New Farakka section BarsoiRadhikapur branch line Dumka–Bhagalpur...
    9 KB (1,071 words) - 06:36, 8 April 2025
  • Rupnarayanpur on the Howrah–Delhi main line via Ikrah, Churulia & Gaurangdi on 1894–95. The Ikrah-Barabani branch line opened on 1894. This further extended...
    5 KB (373 words) - 09:34, 27 September 2023
  • Thumbnail for Andal–Sainthia branch line
    The Andal–Sainthia branch line is a railway line connecting Andal on the Bardhaman–Asansol section of the Howrah–Delhi main line and Sainthia Junction...
    4 KB (242 words) - 07:42, 26 February 2023
  • Thumbnail for Asansol–Gaya section
    long (89 mi) Chandrapura–Muri–Ranchi–Hatia line started in 1957 and was completed in 1961. In 1902, a branch line of EIR was opened from Sone East Bank (later...
    12 KB (1,141 words) - 13:11, 15 April 2025
  • Thumbnail for New Jalpaiguri–Alipurduar–Samuktala Road line
    Gangtok, the capital of Sikkim. The broad gauge branch line i.e New Mal–Changrabandha–New Cooch Behar line from Malbazar in Jalpaiguri district to Changrabandha...
    13 KB (1,026 words) - 17:09, 10 October 2024
  • Thumbnail for Kolkata Suburban Railway
    line were introduced on the same day, with stops at Bally, Serampore and Chandannagore stations. The broad gauge Sheoraphuli–Tarakeswar branch line was...
    67 KB (6,423 words) - 01:33, 15 May 2025
  • Thumbnail for Howrah–New Jalpaiguri line
    gauge. It was connected to the North Eastern Railway network at Barsoi. The Teesta Valley Line up to Sivok was taken over and converted to metre gauge. The...
    17 KB (1,594 words) - 18:20, 10 December 2024
  • Thumbnail for Bengal Nagpur Railway
    long Branch Line from Bilaspur to Umaria for through connection with the Great Indian Peninsula Railway(GIPR) system at Katni, This BNR main line was completed...
    11 KB (927 words) - 12:08, 16 February 2025
  • Asansol–Tatanagar–Kharagpur line Barauni–Gorakhpur, Raxaul and Jainagar lines Barkakana–Son Nagar line Barsoi–New Farakka section BarsoiRadhikapur branch line Dumka–Bhagalpur...
    5 KB (274 words) - 06:40, 3 April 2025
  • Thumbnail for Avadh Assam Express
    Jalpaiguri (Siliguri) Aluabari Road Junction Dalkhola BIHAR Kishanganj Barsoi Junction Azamnagar Road Katihar Naugachia Thana Bihpur Mansi Khagaria Junction...
    13 KB (876 words) - 17:43, 29 April 2024
  • Thumbnail for Koderma–Hazaribagh–Barkakana–Ranchi line
    The Koderma–Hazaribagh–Barkakana–Ranchi line is an Indian railway line connecting Koderma Junction in the Asansol–Gaya section with Hazaribagh Town, Barkakana...
    8 KB (631 words) - 19:47, 2 August 2024
  • Asansol–Tatanagar–Kharagpur line Barauni–Gorakhpur, Raxaul and Jainagar lines Barkakana–Son Nagar line Barsoi–New Farakka section BarsoiRadhikapur branch line Dumka–Bhagalpur...
    8 KB (656 words) - 11:31, 25 February 2025
  • Thumbnail for Bandel Junction railway station
    Sealdah–Jangipur Road Express (Sealdah–Jangipur Road) Kolkata–Radhikapur Express (Radhikapur–Kolkata) Howrah–Malda Town Intercity Express (Howrah–Malda Town)...
    20 KB (1,923 words) - 02:35, 18 April 2025
  • Thumbnail for Eastern Railway zone
    section of New Farakka–Barsoi line Ahmadpur–Katwa line Andal–Sainthia branch line Andal–Sitarampur loop line Bardhaman–Katwa line Barharwa–Azimganj–Katwa...
    10 KB (854 words) - 07:12, 31 March 2025
  • Thumbnail for Tatanagar–Bilaspur section
    (32 mi) long 5 ft 6 in (1,676 mm) broad gauge Champa–Korba–Gevra Road branch line was constructed between 1953 and 1956. The Bengal Nagpur Railway was...
    28 KB (2,767 words) - 02:26, 11 May 2025
  • Sakri–Jainagar branch opened in 1905. The Jhanjharpur–Laukaha Bazar line opened in 1976. Presently services are suspended on this 36 km line since 2015,...
    5 KB (380 words) - 09:40, 2 February 2024
  • Thumbnail for North Eastern Railway zone
    Asansol–Tatanagar–Kharagpur line Barauni–Gorakhpur, Raxaul and Jainagar lines Barkakana–Son Nagar line Barsoi–New Farakka section BarsoiRadhikapur branch line Dumka–Bhagalpur...
    10 KB (686 words) - 07:12, 31 March 2025
  • Thumbnail for Khurda Road–Visakhapatnam section
    line to Cuttack, including the branch line to Puri, was taken over by Bengal Nagpur Railway in 1902. The 79 km (49 mi) Vizianagaram–Parvatipuram line...
    11 KB (889 words) - 12:59, 13 August 2024
  • Thumbnail for Dalkhola railway station
    Capital Express Jogbani–Siliguri Town Intercity Express Siliguri Junction - Radhikapur Express Sealdah - New Alipurduar Teesta Torsha Express Siliguri Junction-Balurghat...
    9 KB (413 words) - 06:51, 23 March 2025
  • Thumbnail for Katihar–Siliguri line
    Katihar–Siliguri line is a railway line connecting Katihar in the Indian state of Bihar with Siliguri Junction in West Bengal, via Barsoi, Dalkhola, Kishanganj...
    7 KB (618 words) - 19:26, 15 October 2024
  • Thumbnail for Darjeeling Himalayan Railway
    Revisited: A journey on the Darjeeling Himalayan Railway. Narrow Gauge Branch Lines series. Midhurst, West Sussex, UK: Middleton Press. ISBN 9781908174093...
    36 KB (3,539 words) - 01:26, 19 April 2025