Launch commit criteria are the criteria which must be met in order for the countdown and launch of a Space Shuttle or other launch vehicle to continue...
7 KB (953 words) - 07:20, 31 March 2025
reported, because the temperature of the SRBs was not part of the Launch Commit Criteria.: 118 In addition to its effect on the O-rings, the cold temperatures...
124 KB (12,324 words) - 14:48, 11 July 2025
Space Shuttle (redirect from Space shuttle launch)
(May 20, 1999). "Space Shuttle weather launch commit criteria and KSC end of mission weather landing criteria". Kennedy Space Center (KSC). KSC Release...
113 KB (12,484 words) - 10:37, 22 July 2025
Retrieved May 17, 2012. "Space Shuttle Weather Launch Commit Criteria and KSC End of Mission Weather Landing Criteria". KSC Release No. 39-99. NASA Kennedy Space...
63 KB (8,453 words) - 15:58, 20 July 2025
Countdown (redirect from Launch countdown)
Center Release 39-99: Space Shuttle weather launch commit criteria and KSD end of mission weather landing criteria". Nasa.gov. NASA. May 20, 1999. Archived...
15 KB (1,916 words) - 21:36, 29 June 2025
Landing craft, control (LCC) and Amphibious command ship (LCC) Launch commit criteria Launch Control Center, at Kennedy Space Center Lochluichart railway...
3 KB (406 words) - 09:55, 13 March 2025
Terran 1 (category Space launch vehicles of the United States)
scrubbed due to "exceeding launch commit criteria limits for propellant thermal conditions on stage two". A second launch attempt on 11 March was also...
23 KB (1,519 words) - 18:36, 24 May 2024
STS-122 (category Spacecraft launched in 2008)
low. The Launch Commit Criteria (LCC) require that three of the four sensor systems function properly prior to liftoff. The scheduled launch time was...
78 KB (6,314 words) - 17:27, 20 June 2025
decision-making process for flight rules, procedures, techniques, and launch commit criteria. He was also assigned as an Astronaut Support Person (ASP), or "Cape...
8 KB (839 words) - 04:40, 21 March 2024
procedure documents, launch commit criteria documents, hardware requirement documents, and any other items used by the engineering launch countdown teams during...
108 KB (13,238 words) - 18:54, 17 July 2025
STS-93 (category Spacecraft launched in 1999)
to the leak by the right engine's controller did not violate any launch commit criteria and liftoff proceeded normally. However, approximately 5 seconds...
25 KB (2,170 words) - 10:09, 21 July 2025
STS-61 (category Spacecraft launched in 1993)
Gear wheel well. Since there were 4 delta-P transducers and the Launch commit criteria (LCC) required only 3 of 4, the transducer was depinned and would...
30 KB (3,783 words) - 02:40, 3 July 2025
STS-37 (category Spacecraft launched in 1991)
seconds because of two possible weather-condition violations of the launch commit criteria (LCC). The first concerned the cloud ceiling being 150 m (490 ft)...
17 KB (1,466 words) - 14:11, 9 May 2025
STS-70 (category Spacecraft launched in 1995)
tank automatic gain control (AGC) ET range safety system receiver. Launch Commit Criteria contingency procedures were worked and the count then proceeded...
14 KB (1,416 words) - 17:37, 22 July 2025
STS-34 (category Spacecraft launched in 1989)
Facility. The weather conditions were in violation of the launch commit criteria for a Return To Launch Site (RTLS) landing in the event of an aborted flight...
18 KB (1,558 words) - 18:55, 5 May 2025
STS-36 (category Spacecraft launched in 1990)
successful launch on February 28, 1990, was set for a classified launch window, lying within a launch period extending from 00:00 to 04:00 EST. The launch weight...
20 KB (1,438 words) - 19:18, 12 May 2025
STS-133 (category Spacecraft launched in 2011)
leak then reduced to a level below 20,000 ppm was recorded. The Launch Commit Criteria limit was 40–44,000 ppm. The leak was only being observed during...
75 KB (7,836 words) - 01:18, 25 May 2025
early shutdown was later reported to be because of conservative test commit criteria on the thrust vector control system, specific only for ground testing...
187 KB (15,328 words) - 13:44, 16 July 2025
weather data to NASA's Lightning Launch Commit Criteria for Shuttle countdown procedures. For Shuttle landing criteria and site selection determination...
9 KB (950 words) - 06:01, 31 March 2025
Travel Companies Commit To Sustainable Tourism through the Global Sustainable Tourism Criteria". UNWTO. Retrieved 2025-07-12. "Launch of the Global Sustainable...
4 KB (403 words) - 09:04, 12 July 2025
before committing to—and, if need be, to re-prioritise—further work. The ultimate design review, if successful, therefore triggers the product launch or product...
2 KB (239 words) - 15:16, 20 February 2025
Right to die (redirect from Choose to commit suicide)
, not due to pressure from doctors or family to 'do what is right' and commit suicide), that the choice be 'the best option in these circumstances' (desired...
49 KB (5,587 words) - 18:44, 27 May 2025
Enlargement of NATO (redirect from Criteria and process of NATO enlargement)
member state can put some criteria forward that have to be attained. In practice, NATO formulates a common set of criteria. However, for instance, Greece...
220 KB (18,798 words) - 14:14, 22 July 2025
Delta II (redirect from Delta II Heavy launch vehicle)
Delta II page at Boeing.com Delta I, II und III launch data at Skyrocket.de History of the Delta launch vehicle Delta II Launch Weather Commit Criteria...
42 KB (4,130 words) - 09:02, 2 June 2025
commits generally are not overwritten, but are reverted by committing another change which reverses an earlier commit. This prevents shared commits from...
72 KB (7,337 words) - 08:51, 22 July 2025
Bulgaria and the euro (section Convergence criteria)
reports published on 4 June 2025 concluded that Bulgaria met the convergence criteria. On 8 July 2025, the European Parliament endorsed Bulgaria's entry in the...
84 KB (8,893 words) - 22:40, 16 July 2025
threat. Used in launch-and-leave tactics and for all flight members to execute.* [A/A] OUTLAW CONTACT has met point of origin criteria for ROE.[A/A] [S/A]...
98 KB (12,159 words) - 18:28, 5 June 2025
Pariah state (section Criteria for pariah statehood)
nineteenth century on a "religious basis."). In more recent times, however, the criteria for and attached implications of pariah statehood, as well as the designating...
16 KB (2,001 words) - 15:51, 18 May 2025
On October 7, 2023, Hamas and several other Palestinian militant groups launched coordinated armed incursions from the Gaza Strip into the Gaza envelope...
340 KB (28,003 words) - 13:23, 21 July 2025
European Space Agency (section Launch vehicles)
European launch vehicle Ariane 6 is operated through Arianespace with ESA sharing in the costs of launching and further developing the launch vehicle....
120 KB (10,162 words) - 05:10, 9 July 2025