• Thumbnail for D Line Extension
    The D Line Subway Extension Project (formerly known as the Westside Subway Extension, the Subway to the Sea, and the Purple Line Extension) is a construction...
    60 KB (5,413 words) - 07:12, 8 August 2025
  • Thumbnail for D Line (Los Angeles Metro)
    of track to the line. The extension is expected to open in phases from 2025 to 2028. The D Line is a 5.1-mile (8.2 km) line that begins at Wilshire/Western...
    24 KB (2,030 words) - 00:14, 6 August 2025
  • Thumbnail for Green Line Extension
    The Green Line Extension (GLX) was a construction project to extend the Massachusetts Bay Transportation Authority (MBTA) Green Line light rail system...
    125 KB (11,694 words) - 17:08, 2 August 2025
  • Thumbnail for K Line Northern Extension
    The K Line Northern Extension, formerly known as the Crenshaw Northern Extension, is a planned Los Angeles Metro Rail light rail extension connecting Expo/Crenshaw...
    23 KB (1,653 words) - 03:03, 5 August 2025
  • Thumbnail for Foothill Extension
    The Foothill Extension (formerly the Gold Line Foothill Extension) is a construction project extending the light rail A Line, a part of the Los Angeles...
    38 KB (3,707 words) - 02:26, 5 August 2025
  • Thumbnail for Los Angeles Metro
    Los Angeles Metro (category Pages using the Kartographer extension)
    Valley and the D Line at Westwood/UCLA Heavy Rail or Monorail extension from the D line at Westwood/UCLA to LAX Extension of the E Line from East Los Angeles...
    46 KB (4,573 words) - 16:48, 10 August 2025
  • Thumbnail for CRRC HR4000
    minute train frequency, and extensions of the D Line over three phases. Shortly after the groundbreaking of the D Line Extension in 2014, procurement started...
    14 KB (1,305 words) - 18:16, 6 June 2025
  • the Purple Line became the D Line, the Gold Line became the L Line, the Orange Line became the G Line, and the Silver Line became the J Line. Before 2023...
    140 KB (14,766 words) - 13:37, 10 August 2025
  • Thumbnail for K Line (Los Angeles Metro)
    Inglewood and Westchester/​Veterans stations. Foothill Extension D Line Extension Southeast Gateway Line East San Fernando Valley Light Rail Transit Project...
    44 KB (3,831 words) - 23:30, 5 August 2025
  • Thumbnail for Wilshire/La Cienega station
    Wilshire/La Cienega station (category Pages using the Kartographer extension)
    La Cienega Boulevard. It is in the design/construction phase of the D Line Extension project. The tunneling work from the east (Wilshire/La Brea station)...
    9 KB (805 words) - 02:28, 5 August 2025
  • Thumbnail for Wilshire/Western station
    Wilshire/Western station (category D Line (Los Angeles Metro) stations)
    the line currently terminates here and the B Line travels to the Valley via Vermont Avenue. Metro is now currently constructing the D Line Extension to...
    7 KB (480 words) - 02:31, 25 July 2025
  • Thumbnail for Central line (London Underground)
    permission in 1891 for a tube line between Shepherd's Bush and a station at Cornhill, and the following year an extension to Liverpool Street was authorised...
    69 KB (5,970 words) - 11:53, 8 August 2025
  • Thumbnail for Piccadilly line
    Electric Railways of London (UERL) took over the line, it was renamed the Piccadilly line. Subsequent extensions were made to Cockfosters, Hounslow West and...
    145 KB (15,166 words) - 09:58, 7 August 2025
  • A product line extension is the use of an established product brand name for a new item in the same product category. Line extensions occur when a company...
    11 KB (1,541 words) - 18:36, 20 June 2024
  • Thumbnail for Century City station (Los Angeles Metro)
    Century City station (Los Angeles Metro) (category Pages using the Kartographer extension)
    locally as a subway) station on the D Line of the Los Angeles Metro Rail system. It is part of the D Line Extension project, in Los Angeles, California...
    6 KB (446 words) - 07:04, 8 August 2025
  • Thumbnail for Beverly Drive station
    Beverly Drive station (category D Line (Los Angeles Metro))
    subway) station on the D Line of the Los Angeles Metro Rail system. It is currently under construction as part of the D Line Extension project, in Beverly...
    16 KB (1,386 words) - 00:25, 6 August 2025
  • Thumbnail for Yanchep line
    later extension to Butler. The extension to Clarkson was planned to be within the freeway's median, for consistency with the rest of the Joondalup line and...
    172 KB (15,059 words) - 09:49, 10 August 2025
  • Thumbnail for Red Line (MBTA)
    Red Line Northwest Extension, originally planned to run to Arlington Heights or Route 128, opened to Davis in 1984 and Alewife in 1985. The Red Line was...
    79 KB (7,776 words) - 03:15, 21 July 2025
  • Metro. Retrieved May 14, 2025. Mandelkern, India (July 23, 2025). "D Line Subway Extension Section 1 update: Ninety-eight percent finished and counting"....
    25 KB (1,466 words) - 00:26, 6 August 2025
  • Thumbnail for Los Angeles Metro Rail
    Los Angeles Metro Rail (category Pages using the Kartographer extension)
    January 4, 2025. "A Line Extension to Pomona". Los Angeles Metro. July 24, 2025. Retrieved July 24, 2025. "Purple (D Line) Extension Transit Project". LA...
    87 KB (5,358 words) - 23:13, 9 August 2025
  • Thumbnail for Westwood/VA Hospital station
    Westwood/VA Hospital station (category Pages using the Kartographer extension)
    The station is currently in the under construction Phase 3 of the D Line Extension project, with contractors hired in 2019. The station is slated to open...
    4 KB (295 words) - 02:28, 5 August 2025
  • Thumbnail for Westwood/UCLA station
    Westwood/UCLA station (category Pages using the Kartographer extension)
    The station is currently under construction, part of Phase 3 of the D Line Extension project, with contractors hired in 2019. The station is slated to open...
    4 KB (286 words) - 04:48, 25 July 2025
  • Thumbnail for B Line (Los Angeles Metro)
    D Line Extension (to allow shorter headways), this Arts District extension could possibly be partially completed as part of the Purple Line Extension...
    28 KB (2,296 words) - 00:20, 6 August 2025
  • Thumbnail for Green Line (MBTA)
    with cuts as late as 1985. The new D branch opened on a converted commuter rail line in 1959. The Green Line Extension project extended two branches into...
    94 KB (9,541 words) - 05:38, 25 July 2025
  • independent main line, part of the D Line forms an extension of U4 to Bockenheimer Warte from the central railway station. The B line can be divided into...
    41 KB (5,241 words) - 18:11, 16 July 2025
  • Thumbnail for Link light rail
    The first phase of the 2 Line opened on April 27, 2024, between South Bellevue and Redmond Technology stations, an extension east to Downtown Redmond...
    109 KB (9,076 words) - 06:31, 4 August 2025
  • Thumbnail for Blue Line (Namma Metro)
    launched the first ever U Girder span on ORR-Airport metro line. The extension of the Purple Line and construction of the Pink and Yellow Lines is currently...
    41 KB (2,777 words) - 21:07, 10 August 2025
  • Thumbnail for Paris Métro Line 14
    internationally to build metro systems. A northward extension to Mairie de Saint-Ouen opened in December 2020. The line extended further north to Saint-Denis–Pleyel...
    41 KB (3,621 words) - 19:04, 6 August 2025
  • The Metro Blue Line Extension (sometimes referred to as Bottineau LRT) is a proposed light rail line extension in Hennepin County, Minnesota, projected...
    31 KB (2,932 words) - 19:47, 14 July 2025
  • Thumbnail for Line 2 Bloor–Danforth
    It opened on February 26, 1966, and extensions at both ends were completed in 1968 and again in 1980. The line runs primarily a few metres north of Bloor...
    103 KB (10,074 words) - 01:08, 5 August 2025