• economics, a semi-variable cost (also referred to as semi-fixed cost) is an expense which contains both a fixed-cost component and a variable-cost component...
    9 KB (1,231 words) - 21:37, 28 March 2024
  • Thumbnail for Variable cost
    an entire range of time horizons. Cost Fixed cost Cost accounting Cost curve Cost driver Semi variable cost Total cost Total revenue share Contribution...
    7 KB (924 words) - 04:01, 20 March 2025
  • cost Incremental cost Indirect cost Life-cycle cost Outline of industrial organization Repugnancy costs Semi-variable cost Total cost Variable cost Gross...
    10 KB (1,076 words) - 23:11, 12 June 2025
  • Thumbnail for Total cost
    of total cost or variable cost. Either of these derivatives work because the total cost includes variable cost and fixed cost, but fixed cost is a constant...
    6 KB (749 words) - 10:13, 8 June 2025
  • fixed, variable, or semi-variable. Fixed costs remain unchanged irrespective of changes in the production volume over a given period of time. Variable costs...
    26 KB (3,429 words) - 11:57, 29 May 2025
  • disposal, etc. Semi-variable costs, the expenses necessary to keep the business in proper condition. Overhead costs for a business are the cost of resources...
    6 KB (846 words) - 10:47, 7 June 2025
  • should not be deemed a "fixed" cost, with its cost spread out over time. Sunk costs should be kept separate. The "variable costs" for this project might...
    39 KB (4,809 words) - 04:37, 17 June 2025
  • Thumbnail for Semi-submersible platform
    drilling semi-submersibles were converted for use as combined drilling and production platforms. These vessels offered very stable and cost effective...
    13 KB (1,370 words) - 14:38, 5 December 2023
  • Thumbnail for Continuously variable transmission
    A continuously variable transmission (CVT) is an automated transmission that can change through a continuous range of gear ratios, typically resulting...
    42 KB (5,044 words) - 21:49, 12 June 2025
  • The cost of living is the cost of maintaining a certain standard of living for an individual or a household. Changes in the cost of living over time can...
    20 KB (2,475 words) - 20:54, 19 June 2025
  • Thumbnail for M110 Semi-Automatic Sniper System
    The M110 Semi Automatic Sniper System (M110 SASS) is an American semi-automatic sniper rifle that is chambered for the 7.62×51mm NATO round. It is manufactured...
    31 KB (2,648 words) - 06:52, 14 April 2025
  • A cost estimate is the approximation of the cost of a program, project, or operation. The cost estimate is the product of the cost estimating process....
    26 KB (3,295 words) - 12:52, 14 June 2025
  • Thumbnail for Wing configuration
    duplicated here under more than one heading. This is particularly so for variable geometry and combined (closed) wing types. Most of the configurations described...
    50 KB (5,556 words) - 09:26, 18 June 2025
  • exists another generalization of CRFs, the semi-Markov conditional random field (semi-CRF), which models variable-length segmentations of the label sequence...
    17 KB (2,065 words) - 17:49, 16 December 2024
  • Thumbnail for Compressor
    also happen in semi hermetic compressors where the motor operates in the refrigerant). Typically, hermetic compressors are used in low-cost factory-assembled...
    49 KB (6,856 words) - 16:35, 20 March 2025
  • A semi-automatic transmission is a multiple-speed transmission where part of its operation is automated (typically the actuation of the clutch), but the...
    63 KB (5,694 words) - 19:15, 6 February 2025
  • manufacturers, provided by Monroe Shock Absorbers called CVSAe, or Continuously Variable Semi-Active electronic. In 2008, with the introduction of the Nissan GT-R...
    31 KB (3,538 words) - 09:26, 24 May 2025
  • Thumbnail for Progressive lens
    progressive lenses were relatively crude designs. Right and left were identical variable power lenses with distance and reading power centers in the upper and lower...
    11 KB (1,372 words) - 03:17, 26 May 2025
  • Thumbnail for M110A1 rifle
    M110A1 CSASS (Compact Semi Automatic Sniper System) or the M110A1 SDMR (Squad Designated Marksman Rifle). It is an American semi-automatic sniper rifle...
    28 KB (2,070 words) - 00:20, 15 April 2025
  • "mathematical backbone" for dealing with problems where variables change with time or another reference variable. Infinitesimal calculus was formulated separately...
    76 KB (8,805 words) - 06:25, 7 June 2025
  • bound variable V in the expression E, implying a time cost, or one must keep track of the locations of free variables in some way, implying a space cost. A...
    90 KB (12,117 words) - 02:29, 15 June 2025
  • Thumbnail for Beta distribution
    parameters, denoted by alpha (α) and beta (β), that appear as exponents of the variable and its complement to 1, respectively, and control the shape of the distribution...
    245 KB (40,562 words) - 12:56, 14 May 2025
  • Thumbnail for Grassland
    sedge (Cyperaceae) and rush (Juncaceae) can also be found along with variable proportions of legumes such as clover, and other herbs. Grasslands occur...
    56 KB (6,111 words) - 06:35, 9 June 2025
  • Thumbnail for Eurovision Song Contest 2025
    Eurovision Song Contest 2025 (category Wikipedia pages semi-protected against vandalism)
    (SRG SSR), the contest was held at St. Jakobshalle, and consisted of two semi-finals on 13 and 15 May, and a final on 17 May 2025. The three live shows...
    246 KB (12,172 words) - 18:46, 19 June 2025
  • live Φ. Semi-pruned SSA form is an attempt to reduce the number of Φ functions without incurring the relatively high cost of computing live-variable information...
    32 KB (3,970 words) - 13:38, 6 June 2025
  • TE_{i}\cdot \exp \left\{{v_{i}}\right\}} We assume that TEi is also a stochastic variable, with a specific distribution function, common to all producers. We can...
    7 KB (912 words) - 15:15, 21 May 2025
  • SC stands for semi-continuous and indicates that the variable may be zero, but if not must be equal to at least the value given. Variables not mentioned...
    11 KB (1,497 words) - 01:33, 21 April 2025
  • distributedly choose values for a set of variables such that the cost of a set of constraints over the variables is minimized. Distributed Constraint Satisfaction...
    30 KB (3,425 words) - 01:27, 2 June 2025
  • Thumbnail for Volatile organic compound
    volatile organic compounds); compounds appearing later are called SVOC (semi-volatile organic compounds). France, Germany (AgBB/DIBt), Belgium, Norway...
    71 KB (7,745 words) - 14:26, 22 May 2025
  • Thumbnail for Potentiometer
    divider. If only two terminals are used, one end and the wiper, it acts as a variable resistor or rheostat. The measuring instrument called a potentiometer is...
    30 KB (3,847 words) - 07:29, 11 May 2025