Nordex SE is a European company that designs, sells and manufactures wind turbines. The company's headquarters in the German city of Rostock while management...
7 KB (502 words) - 10:26, 29 October 2024
Energy Limited (India) Suzlon (India) World Wind (India) Enercon (Germany) Nordex SE (Germany) UNISON (South Korea) Hanjin (South Korea) Doosan (South Korea)...
5 KB (416 words) - 09:12, 7 October 2023
BrightSource Energy, Enercon, First Solar, Gamesa, GE Energy, Goldwind, Nordex, Sinovel, Suntech, Trina Solar, Vestas and Yingli. Alternative Energy: Political...
6 KB (553 words) - 02:31, 24 December 2023
Technology team won in 2010. Also, the Uruguayan plant of cars owned by Nordex S.A. in Uruguay has made since 2004 the Renault Trucks models like Midlum...
21 KB (1,983 words) - 20:26, 24 September 2024
Uruguay is manufactured by the Uruguayan car and motor vehicle manufacturer Nordex S.A. The Midlum was replaced by the Renault Trucks D in 2013. "Renault Midlum...
2 KB (144 words) - 09:33, 22 June 2024
MW each) at Gharo, Thatta District. The EPC contractors were Nordex and Descon with Nordex as the lead contractor. Foundation Wind Energy II (Private)...
17 KB (1,228 words) - 15:32, 27 October 2024
Expert are assembled as CKD in Montevideo, Uruguay. As of October 2019, Nordex S.A. has produced 13,000 units, with most of them being exported to Brazil...
43 KB (2,709 words) - 16:18, 23 October 2024
"Aplicación del Cuadro de Mando Integral en Nordex S.A." [Application of the Balanced Scorecard at Nordex S.A.] (PDF) (in Spanish). Montevideo, Uruguay:...
40 KB (4,391 words) - 01:58, 27 October 2024
Infineon Technologies Jenoptik Kontron MorphoSys Nagarro SE Nemetschek Nordex PNE AG Qiagen SAP Sartorius Siemens Healthineers Siltronic SMA Solar Technology...
3 KB (230 words) - 15:36, 19 March 2024
Corolla Altis, Corolla Cross, Sienta, TownAce, Vios XP150, Yaris Cross AC200 Nordex S.A., Montevideo – ProAce Ontario, California (2004) – Toyota components...
27 KB (1,459 words) - 01:19, 18 September 2024
Nordex wind turbine manufacturing plant in Jonesboro, Arkansas, United States...
85 KB (9,098 words) - 12:18, 1 October 2024
DVB-T-Sendeturm 190 1986 Demolished in 2023 after loss of function. 4 x Wind turbine Nordex N100 190 2013 City-Hochhaus Leipzig 142 1972 Total height 155 m, headquarters...
165 KB (15,213 words) - 18:31, 30 October 2024
until April 2001 in Uruguay, where it was produced for South America by Nordex S.A.. Technically, the Express was based on the second generation of the...
8 KB (605 words) - 11:46, 25 August 2024
27.3 billion BMW 71 Susanne Klatten Germany 26.5 billion BMW, Altana, Nordex, SGL Carbon 118 Beate Heister (b. Albrecht) & Karl Albrecht Jr. Germany...
8 KB (45 words) - 22:35, 4 October 2024
(1997–2004) — merged from NEG and Micon in 1997, merged with Vestas in 2004 Nordex (1985–present) — moved to Germany Nordtank Energy Group (NEG), formerly...
989 bytes (87 words) - 19:58, 9 February 2024
LLC NOMADIC United States NOC Norcopter NORCOPTER Norway NEF Nord-Flyg NORDEX Sweden 5N AUL Nordavia ARCHANGELSK AIR Russia JH NES Nordeste Linhas Aéreas...
3 KB (795 words) - 00:36, 18 July 2024
which was built for Peel Wind Power Ltd, produces electricity from 26 Nordex N80 wind turbines. It has a total nameplate capacity of 65 MW of electricity...
37 KB (3,643 words) - 19:54, 10 September 2024
Sweden. The wind farm was opened on 26 September 2009. It consists of 12 Nordex 2.5 MW N90 wind turbines. The developer and operator of the wind farm is...
2 KB (194 words) - 23:14, 15 March 2024
Club" Former title and general sponsors included Ukrtelecom, Kyivstar, Nordex (Austria), and Geoton. The following is a list of match results in the last...
99 KB (5,022 words) - 11:07, 21 October 2024
Assembly) Russia: Yelabuga (Ford Sollers; 2014–2022) Uruguay: Montevideo (Nordex S.A.) Designer Paul Campbell Body and chassis Class Full-size van Body style...
89 KB (9,120 words) - 02:11, 7 October 2024
Uruguay by Dasur, and the chassis were sent from Argentina so that the Nordex company could make the assembly. In 1971 at the time of its presentation...
25 KB (2,175 words) - 02:31, 31 October 2024
Peruvian border, with 106 mm (4.2 in) cannons.[citation needed] From 1965, Nordex produced its own panel van and pick-up versions of the Citroën 2CV. While...
113 KB (13,411 words) - 09:12, 23 October 2024
Scorpio-N Production June 2002 – present Assembly Maharashtra, India BAG, Egypt Nordex, Montevideo, Uruguay Body and chassis Class Mid-size SUV (India) Compact...
23 KB (2,019 words) - 05:16, 18 October 2024
9UJ Uruguay Chery assembled by Chery Socma S.A. 9UK Lifan 9UW Kia made by Nordex S.A. 9V7 Citroen made by Nordex S.A. 9V8 Peugeot made by Nordex S.A....
111 KB (2,429 words) - 08:09, 30 October 2024
complex that already produces variants of the 1 Series model. Four 2.5 MW Nordex wind turbines at Leipzig came online in 2013, supplying approximately 1⁄5...
141 KB (12,764 words) - 12:08, 17 October 2024
expensive motorcycle in production. In Uruguay, the Prinz 4 was built by Nordex S.A., and a new model, the P6, combined the engine and mechanics of the...
21 KB (2,469 words) - 09:23, 9 August 2024
States. Germany also has a number of turbine manufacturers, like Enercon, Nordex and Senvion. In the first half of 2021, with 22% a contribution to German...
27 KB (2,235 words) - 19:26, 26 August 2024
(Belgium), Noordoostpolder (Netherlands) Vestas V172-7.2MW 7.2 Prototype Nordex N163/6.X 6.8 Commercially deployed February 2024 Olsterwind (Netherlands)...
15 KB (819 words) - 07:15, 17 October 2024
Autoar) and Egypt, under licence. In Uruguay, the Prinz 4 was built by Nordex S.A., and a new model, the P6, combined the engine and mechanics of the...
34 KB (3,581 words) - 04:04, 17 October 2024