Neil Armstrong Operations and Checkout Building (O&C) (previously known as the Manned Spacecraft Operations Building) is a historic building on Merritt Island...
10 KB (928 words) - 20:47, 8 September 2024
Japanese Experiment Module and its robotic arm Adjacent to the Space Station Processing Facility, the Operations and Checkout Building's spacecraft workshop...
35 KB (1,767 words) - 19:43, 27 September 2024
Kennedy Space Center (redirect from Launch Operations Center)
Building for stacking NASA's largest rockets, the Launch Control Center, which conducts space launches at KSC, the Operations and Checkout Building,...
70 KB (6,243 words) - 13:22, 20 May 2025
Operations and Checkout Building to the launch pad before a mission and for launch dress rehearsals, and back to the Operations and Checkout Building...
5 KB (656 words) - 18:30, 10 December 2024
quarantine at the Operations and Checkout Building, where they conducted a dry dress rehearsal, adjusted their sleep schedules, and rehearsed flight procedures...
31 KB (2,853 words) - 14:06, 8 May 2025
Apollo 1 (section Spacecraft and crew preparation)
spacecraft in the Operations and Checkout Building altitude (vacuum) chamber on October 18 and 19, 1966, and the backup crew of Schirra, Eisele and Cunningham...
105 KB (11,777 words) - 21:06, 10 May 2025
Apollo program (section Launch Operations Center)
designated A and B, were completed in October 1965. The LOC also included an Operations and Checkout Building (OCB) to which Gemini and Apollo spacecraft...
153 KB (16,048 words) - 03:28, 19 May 2025
Armstrong Test Facility, in Erie County, Ohio Neil Armstrong Operations and Checkout Building, on Merritt Island, Florida Neil Armstrong Hall of Engineering...
1 KB (194 words) - 01:21, 1 November 2024
Center to take astronauts directly from the orbiter to the Operations and Checkout building, where the vehicle was again lifted up for the astronauts to...
9 KB (1,006 words) - 18:23, 29 April 2025
Space Systems Processing Facility (category Buildings and structures in Merritt Island, Florida)
the internationally manufactured modules and station elements. However the Operations and Checkout Building (which was originally to be the prime factory...
25 KB (2,301 words) - 12:35, 29 July 2024
Apollo 13 (redirect from Apollo 13 Mission Operations Team)
Mission Operations Team. He originally planned to give the award to NASA administrator Thomas O. Paine, but Paine recommended the mission operations team...
117 KB (13,667 words) - 02:23, 19 May 2025
Earthrise (category William Anders)
environmental photograph ever taken". Earthrise was taken by astronaut William Anders during the Apollo 8 mission, the first crewed voyage to orbit the Moon....
23 KB (2,291 words) - 20:13, 16 May 2025
and Checkout Building. Originally built for Project Apollo. The Astrovan was used to transport astronauts from the crew quarters in the Operations and Checkout...
63 KB (8,455 words) - 19:27, 3 April 2025
The Vehicle Assembly Building (originally the Vertical Assembly Building), or VAB, is a large building at NASA's Kennedy Space Center (KSC) in Florida...
27 KB (2,484 words) - 23:32, 5 May 2025
Administrator of NASA (redirect from The Administrator of the National Aeronautics and Space Administration)
The administrator of the National Aeronautics and Space Administration is the highest-ranking official of NASA, the national space agency of the United...
19 KB (633 words) - 23:52, 10 April 2025
Apollo 11 (section Lunar surface operations)
The CSM was mated on January 29, and moved from the Operations and Checkout Building to the Vehicle Assembly Building on April 14. The S-IVB third stage...
187 KB (19,658 words) - 20:38, 10 May 2025
(then designated DSS-49). There has been ongoing construction since 2010 building additional 34 m beam waveguide antenna. Construction of DSS-35 began in...
13 KB (905 words) - 07:36, 23 May 2025
Tesla Model X (section Production and sales)
size class as an SUV, and shares around 30 percent of its content with the Model S, half of the originally planned 60 percent, and weighs about 10 percent...
77 KB (7,724 words) - 05:07, 23 May 2025
Doug Hurley (section Early years and education)
Neil A. Armstrong Operations and Checkout Building before Demo-2 launch. ISS and Demo 2 crews after hatch opening Robert Behnken, and Douglas Hurley are...
18 KB (1,749 words) - 09:36, 8 November 2024
agency was building up to the first Moon landing and the Apollo program was a top national priority, consuming more than half of NASA's budget and driving...
27 KB (2,055 words) - 10:59, 13 April 2025
prior to encapsulation, December 2013, in the Operations and Checkout Building (O&C) EFT-1 Orion Weight and Center of Gravity Test, June 2014 EFT-1 Orion...
15 KB (1,019 words) - 01:27, 21 January 2025
NASA (redirect from National Aeronautics and Space Agency)
Telescope, the four Great Observatories, and associated programs. The Launch Services Program oversees launch operations for its uncrewed launches. NASA traces...
223 KB (20,720 words) - 12:35, 22 May 2025
Langley Research Center (redirect from NASA Engineering and Safety Center)
"NASA Langley Research Center, Full-Scale Wind Tunnel, 224 Hunting Avenue (Building No. 643)", 27 photos, 2 measured drawings, 36 data pages, 4 photo caption...
26 KB (2,255 words) - 14:55, 20 May 2025
Shuttle Landing Facility (redirect from Launch and Landing Facility)
Facilities and geographic features of Kennedy Space Center 4km 2.5miles 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 The Shuttle...
17 KB (1,704 words) - 16:23, 6 April 2025
transformed into an agency that advanced both astronautics and aeronautics—the National Aeronautics and Space Administration. The NASA seal was created in 1958...
18 KB (1,606 words) - 09:40, 7 May 2025
to 320 × 56,000 km to prevent impact with Mars and possible contamination until the year 2019. Operations were terminated on August 17, 1980, after 1,485...
27 KB (2,496 words) - 16:00, 10 April 2025
Glenn Research Center (category Science and technology in Ohio)
Buildings, NASA Glenn Research Center at Lewis Field", 93 data pages HAER No. OH-136, "Glenn Research Center, Propulsion Systems Laboratory No. 1 and...
26 KB (2,125 words) - 06:51, 22 May 2025
Space Shuttle (section Design and development)
Astrovan transported astronauts from the crew quarters in the Operations and Checkout Building to the launch pad on launch day. The NASA Railroad comprised...
112 KB (12,454 words) - 01:53, 17 May 2025
Civil Aviation, specializing in Flight Operation of Aircraft. In 2012, he graduated with an engineering degree and received the military rank of Lieutenant...
9 KB (666 words) - 01:57, 2 May 2025
Artemis program (section Shelter building construction)
altitude chamber inside the Neil Armstrong Operations and Checkout Building at KSC. Rocket stacking operations began on November 20, 2024, when the left...
203 KB (19,310 words) - 10:56, 21 May 2025