• Thumbnail for APR-1400
    The APR-1400 (for Advanced Power Reactor 1400 MW electricity) is an advanced pressurized water nuclear reactor designed by the Korea Electric Power Corporation...
    35 KB (3,058 words) - 03:45, 19 September 2024
  • resolution protocol (ARP) Brügger & Thomet APR, the Advanced Precision Rifle, a Swiss sniper rifle The APR-1400 and APR+ advanced pressurized reactor, a series...
    2 KB (333 words) - 21:43, 22 August 2024
  • Thumbnail for Emirates Nuclear Energy Corporation
    Western Region of Abu Dhabi, and by 2020, the site will be home to four APR-1400 nuclear energy plants. Unit 1 is scheduled to enter commercial operations...
    26 KB (2,530 words) - 15:23, 12 May 2024
  • Thumbnail for Kori Nuclear Power Plant
    Kori reactors are of the OPR-1000 design, while the second two are the APR-1400 design. Shin Kori 1 and 2 achieved commercial operations in 2011 and 2012...
    15 KB (1,072 words) - 01:14, 3 September 2024
  • have reached agreements to build a research reactor in Jordan, and four APR-1400 reactors in the United Arab Emirates. South Korea is poised to enhance...
    26 KB (2,736 words) - 22:32, 17 September 2024
  • was named as preferred bidder. Kepco were thought to prefer their own APR-1400 reactor design for the site, a design which had not yet gone through generic...
    22 KB (2,169 words) - 13:33, 1 November 2023
  • Thumbnail for Barakah nuclear power plant
    commercial nuclear power station in the Arab World. It consists of four APR-1400 nuclear reactors. Total nameplate capacity is 5600 MW which is intended...
    22 KB (1,761 words) - 10:00, 13 September 2024
  • Thumbnail for Hanul Nuclear Power Plant
    connection expected for 20 December 2023. The APR-1400 is a Generation III PWR design with a gross capacity of 1400 MW. It is the first to use Korean-made components...
    12 KB (679 words) - 17:55, 16 September 2024
  • Thumbnail for Korea Hydro & Nuclear Power
    Nuclear Energy Corporation (ENEC) and KEPCO agreed to build four 1400 MWe Korean (APR-1400) nuclear power units in Barakah, United Arab Emirates. KEPCO carried...
    14 KB (1,483 words) - 14:15, 4 September 2024
  • Thumbnail for Nuclear power in the United Arab Emirates
    station in the United Arab Emirates. Construction began in 2012, and four APR-1400 nuclear reactors were planned to start operating successively between 2017...
    13 KB (1,475 words) - 04:10, 1 July 2024
  • (in Croatian). 30 November 2022. Retrieved 14 April 2023. "South Korean APR-1400 starts Opened : New Nuclear - World Nuclear News". "Unit 2 at South Korean...
    194 KB (2,796 words) - 10:26, 21 September 2024
  • design, KEPCO has developed a Generation III reactor uprated plant, the APR-1400. The reference plants used to develop the OPR-1000 design using technology...
    13 KB (1,129 words) - 21:07, 29 August 2024
  • Thumbnail for Pressurized water reactor
    of PWR reactors Nuclear safety systems KEPCO Advanced Power Reactor 1400 (APR-1400) Rosatom VVER-1200 (or AES-2006) Areva EPR Westinghouse Advanced Passive...
    33 KB (4,296 words) - 20:58, 11 June 2024
  • Thumbnail for Nuclear fuel
    Saeed A. (2022). "SiC and FeCrAl as Potential Cladding Materials for APR-1400 Neutronic Analysis". Energies. 15 (10): 3772. doi:10.3390/en15103772. Zinkle...
    56 KB (7,010 words) - 15:14, 24 May 2024
  • Thumbnail for Generation III reactor
    3926 In operation at Kashiwazaki since 1996. NRC certified in 1997. KEPCO APR-1400 PWR 1383 1455 3983 In operation at Kori since Jan 2016. CGNPG ACPR-1000...
    33 KB (1,700 words) - 09:41, 4 September 2024
  • Thumbnail for Polskie Elektrownie Jądrowe
    large-scale, Generation III(+) pressurized water reactors such as the AP1000, APR-1400, and EPR. Until March 2021, the functions of PEJ were a part of the PGE...
    4 KB (413 words) - 14:23, 17 June 2024
  • Thumbnail for Light-water reactor
    of reactivity. Currently offered LWRs include the following ABWR AP1000 APR-1400 CPR-1000 EPR VVER Data from the International Atomic Energy Agency in 2009:...
    25 KB (3,329 words) - 17:29, 7 April 2024
  • diminished. The System 80+ was developed into the Korean OPR-1000 and later APR-1400, and contributed design features to the AP1000. The NRC has certified the...
    3 KB (302 words) - 06:27, 3 September 2023
  • homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    1 KB (140 words) - 05:28, 10 August 2024
  • AP1000 (redirect from CAP-1400)
    on July 31, 2010. Retrieved July 18, 2010. Lin Tian (June 27, 2013). "CAP 1400 Design & Construction" (PDF). SNPTC. IAEA. Retrieved September 20, 2016....
    58 KB (5,962 words) - 18:26, 12 September 2024
  • Thumbnail for Natural nuclear fission reactor
    homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    21 KB (2,577 words) - 18:57, 8 September 2024
  • Thumbnail for EPR (nuclear reactor)
    bids and awarded a contract for construction of four non-EPR stations (APR-1400) to a South Korean group including Korea Electric Power Corporation, Hyundai...
    100 KB (9,485 words) - 20:00, 12 September 2024
  • Thumbnail for Nuclear power in Poland
    large-scale, Generation III(+) pressurized water reactors such as the AP1000, APR-1400, and EPR. It is 100% owned by the State Treasury. PEJ is conducting siting...
    21 KB (2,219 words) - 22:28, 16 August 2024
  • Thumbnail for RBMK
    homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    97 KB (10,954 words) - 05:24, 20 September 2024
  • power plants using their own technology, including the development of APR-1400 next-generation nuclear power plant. The company has also designed and...
    4 KB (228 words) - 20:27, 28 August 2024
  • Thumbnail for Graphite-moderated reactor
    homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    6 KB (706 words) - 23:17, 15 November 2023
  • Thumbnail for Nuclear microreactor
    homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    16 KB (1,921 words) - 21:33, 29 August 2024
  • Thumbnail for Breeder reactor
    homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    80 KB (8,213 words) - 20:22, 12 September 2024
  • homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    3 KB (193 words) - 00:51, 4 September 2024
  • Thumbnail for 2024 Kazakh nuclear power referendum
    reactor technologies, which included the CNNC's HPR-1000 reactor, the KHNP's APR-1400 reactor, Rosatom's VVER-1200 and VVER-1000 reactors, and EDF's EPR-1200...
    63 KB (5,554 words) - 03:07, 15 September 2024