• Thumbnail for APR-1400
    The APR-1400 (for Advanced Power Reactor 1400 MW electricity) is an advanced pressurized water nuclear reactor designed by the Korea Electric Power Corporation...
    35 KB (3,049 words) - 13:37, 15 March 2024
  • resolution protocol (ARP) Brügger & Thomet APR, the Advanced Precision Rifle, a Swiss sniper rifle The APR-1400 and APR+ advanced pressurized reactor, a series...
    2 KB (327 words) - 19:00, 18 April 2024
  • Thumbnail for Kori Nuclear Power Plant
    Kori reactors are of the OPR-1000 design, while the second two are the APR-1400 design. Shin Kori 1 and 2 achieved commercial operations in 2011 and 2012...
    15 KB (1,067 words) - 16:26, 21 March 2024
  • have reached agreements to build a research reactor in Jordan, and four APR-1400 reactors in the United Arab Emirates. South Korea has only four active...
    24 KB (2,566 words) - 13:43, 22 April 2024
  • Thumbnail for Hanul Nuclear Power Plant
    connection expected for 20 December 2023. The APR-1400 is a Generation III PWR design with a gross capacity of 1400 MW. It is the first to use Korean-made components...
    11 KB (619 words) - 20:27, 6 March 2024
  • was named as preferred bidder. Kepco were thought to prefer their own APR-1400 reactor design for the site, a design which had not yet gone through generic...
    22 KB (2,169 words) - 13:33, 1 November 2023
  • Thumbnail for Barakah nuclear power plant
    commercial nuclear power station in the Arab World. It consists of four APR-1400 nuclear reactors. Total nameplate capacity is 5600 MW which is intended...
    19 KB (1,552 words) - 11:19, 18 April 2024
  • Thumbnail for Emirates Nuclear Energy Corporation
    Western Region of Abu Dhabi, and by 2020, the site will be home to four APR-1400 nuclear energy plants. Unit 1 is scheduled to enter commercial operations...
    26 KB (2,519 words) - 08:37, 22 April 2024
  • Nuclear Energy Corporation (ENEC) and KEPCO agreed to build four 1400 MWe Korean (APR-1400) nuclear power units in Barakah, United Arab Emirates. KEPCO carried...
    13 KB (1,436 words) - 12:00, 29 February 2024
  • "South Korean APR-1400 starts Opened : New Nuclear - World Nuclear News". "Korea to resume construction of Shin Hanul 3&4". "Second APR-1400 unit starts...
    192 KB (2,762 words) - 09:48, 23 April 2024
  • Thumbnail for Pressurized water reactor
    of PWR reactors Nuclear safety systems KEPCO Advanced Power Reactor 1400 (APR-1400) Rosatom VVER-1200 (or AES-2006) Areva EPR Westinghouse Advanced Passive...
    33 KB (4,267 words) - 23:06, 31 March 2024
  • Thumbnail for Nuclear fuel
    Saeed A. (2022). "SiC and FeCrAl as Potential Cladding Materials for APR-1400 Neutronic Analysis". Energies. 15 (10): 3772. doi:10.3390/en15103772. Zinkle...
    56 KB (7,082 words) - 18:59, 24 March 2024
  • design, KEPCO has developed a Generation III reactor uprated plant, the APR-1400. The reference plants used to develop the OPR-1000 design using technology...
    12 KB (1,081 words) - 21:12, 20 February 2024
  • Thumbnail for Nuclear power in the United Arab Emirates
    station in the United Arab Emirates. Construction began in 2012, and four APR-1400 nuclear reactors were planned to start operating successively between 2017...
    13 KB (1,476 words) - 00:30, 11 April 2024
  • Thumbnail for Light-water reactor
    of reactivity. Currently offered LWRs include the following ABWR AP1000 APR-1400 CPR-1000 EPR VVER Data from the International Atomic Energy Agency in 2009:...
    25 KB (3,329 words) - 17:29, 7 April 2024
  • AP1000 (redirect from CAP-1400)
    on July 31, 2010. Retrieved July 18, 2010. Lin Tian (June 27, 2013). "CAP 1400 Design & Construction" (PDF). SNPTC. IAEA. Retrieved September 20, 2016....
    58 KB (5,940 words) - 07:27, 3 April 2024
  • Thumbnail for Generation III reactor
    3926 In operation at Kashiwazaki since 1996. NRC certified in 1997. KEPCO APR-1400 PWR 1383 1455 3983 In operation at Kori since Jan 2016. CGNPG ACPR-1000...
    33 KB (1,700 words) - 05:00, 10 April 2024
  • homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    1 KB (140 words) - 02:07, 16 February 2024
  • Thumbnail for Natural nuclear fission reactor
    homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    23 KB (2,978 words) - 02:16, 27 April 2024
  • Thumbnail for Polskie Elektrownie Jądrowe
    large-scale, Generation III(+) pressurized water reactors such as the AP1000, APR-1400, and EPR. Until March 2021, the functions of PEJ were a part of the PGE...
    4 KB (426 words) - 13:42, 28 October 2023
  • Thumbnail for Breeder reactor
    homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    85 KB (8,717 words) - 22:38, 18 April 2024
  • Thumbnail for Graphite-moderated reactor
    homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    6 KB (706 words) - 23:17, 15 November 2023
  • Thumbnail for RBMK
    homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    95 KB (10,911 words) - 02:47, 27 April 2024
  • Thumbnail for Aircraft Nuclear Propulsion
    homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    16 KB (1,900 words) - 06:50, 6 April 2024
  • diminished. The System 80+ was developed into the Korean OPR-1000 and later APR-1400, and contributed design features to the AP1000. The NRC has certified the...
    3 KB (302 words) - 06:27, 3 September 2023
  • Thumbnail for Feedwater heater
    its evolutionary successors, (e.g. Korea Electric Power Corporation's APR-1400) incorporate an integral feedwater economizer. This economizer preheats...
    6 KB (709 words) - 01:16, 8 September 2023
  • Thumbnail for EPR (nuclear reactor)
    bids and awarded a contract for construction of four non-EPR stations (APR-1400) to a South Korean group including Korea Electric Power Corporation, Hyundai...
    97 KB (9,301 words) - 02:14, 18 April 2024
  • Thumbnail for Small modular reactor
    homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    95 KB (10,835 words) - 19:50, 17 April 2024
  • Thumbnail for High-temperature gas-cooled reactor
    homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    15 KB (1,539 words) - 18:11, 25 February 2024
  • Thumbnail for VVER
    homogeneous Boiling BWR ABWR ESBWR Kerena Natural fission Pressurized AP1000 APR-1400 APR+ APWR ATMEA1 CAP1400 CPR-1000 EPR HPR-1000 ACPR1000 ACP1000 VVER IPWR-900...
    55 KB (3,960 words) - 09:57, 2 February 2024