• Thumbnail for Bathinda–Rewari line
    The BathindaRewari line is a railway line connecting Bathinda in the Indian state of the Punjab and Rewari in Haryana. There are links to Sadulpur and...
    5 KB (258 words) - 02:33, 17 February 2024
  • from Bathinda railway station. The Rajputana–Malwa Railway extended the 1,000 mm (3 ft 3+3⁄8 in)-wide metre-gauge Delhi–Rewari line to Bathinda in 1884...
    8 KB (473 words) - 17:14, 14 December 2023
  • with 6 broad-gauge mostly electrified tracks of BathindaRewari line and Jakhal–Hisar–Sadalpur line, going in 4 directions at an average speed of 120 km/h...
    13 KB (1,174 words) - 14:05, 30 December 2023
  • Thumbnail for Jodhpur–Bathinda line
    The Jodhpur–Bathinda line connects Jodhpur, in the Indian state of Rajasthan to Bathinda in the Punjab, via Dabwali Railway in Haryana. During the British...
    6 KB (445 words) - 21:05, 26 April 2024
  • The Golden Line (Line 10) is an under-construction rapid transit line of the Delhi Metro. It will connect southern Delhi directly with Indira Gandhi International...
    13 KB (918 words) - 20:28, 25 April 2024
  • Thumbnail for Rewari Junction railway station
    seventh railway line from Rewari will be laid as a dedicated freight railway line as a part of the Western Dedicated Freight Corridor. Rewari railway junction...
    25 KB (2,835 words) - 05:24, 27 March 2024
  • Thumbnail for Blue Line (Delhi Metro)
    The Blue Line (Line 3 & Line 4) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India. It is the longest line (by total length)...
    23 KB (693 words) - 18:27, 22 April 2024
  • Thumbnail for List of railway stations in Jammu and Kashmir
    Region of Jammu and Kashmir. For more information see Bhanupli–Leh line Jammu–Baramulla line "Railways seeks land at Leh to expedite rail link project". The...
    5 KB (73 words) - 08:35, 19 January 2023
  • The Jammu–Baramulla line is a railway track being laid to connect the Kashmir Valley in the Indian union territory of Jammu and Kashmir with Jammu railway...
    49 KB (5,006 words) - 16:50, 22 April 2024
  • Thumbnail for Samjhauta Express
    lines BathindaRewari line Bathinda–Rajpura line Bikaner–Rewari line Bhanupli–Leh line Chandigarh–Sahnewal line Delhi–Fazilka line Delhi–Kalka line...
    13 KB (1,204 words) - 06:05, 28 March 2024
  • (3 ft 3+3⁄8 in) wide metre gauge Delhi–Rewari line to Bathinda in 1884.[unreliable source?] The BathindaRewari metre-gauge line was converted to 5 ft 6 in (1...
    4 KB (207 words) - 02:34, 17 February 2024
  • crossing at KMP Expressway and will continue along with Rewari Jaipur (via Narnaul-Chomu) Railway Line. The alignmnet will run alongside existing Railway lines...
    12 KB (858 words) - 08:42, 18 April 2024
  • Thumbnail for North Western Railway zone
    Delhi–Rewari section of Delhi–Fazilka line to Bathinda,[unreliable source?] which was The Southern Punjab Railway Co. opened the Delhi–Bathinda–Samasatta...
    19 KB (2,120 words) - 21:01, 26 April 2024
  • The Rajpura–Bathinda line is a railway line connecting Bathinda and Rajpura in the Indian state of Punjab. The line is under the administrative jurisdiction...
    6 KB (410 words) - 11:51, 24 February 2024
  • The Bathinda–Rohtak line is a railway line connecting Bathinda in the Indian state of the Punjab and Rohtak in Haryana.The line is under the administrative...
    4 KB (222 words) - 21:19, 10 April 2024
  • Thumbnail for Yellow Line (Delhi Metro)
    The Yellow Line (Line 2) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India. It consists of 37 stations from Samaypur Badli...
    14 KB (323 words) - 10:56, 23 April 2024
  • Thumbnail for Red Line (Delhi Metro)
    The Red Line (Line 1) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India. It is an entirely elevated line and has 29 stations...
    20 KB (804 words) - 07:59, 24 April 2024
  • The Rishikesh–Karnaprayag line is an under-construction railway line, which will run from Yog Nagari Rishikesh railway station in Rishikesh to Karnaprayag...
    10 KB (750 words) - 10:46, 13 April 2024
  • Thumbnail for Grand Trunk Express
    were attached to the Frontier Mail and reached Peshawar traveling through Bathinda, Ferozepore and Lahore. Thus the train covered a distance of 2497 miles...
    12 KB (1,283 words) - 08:17, 21 March 2024
  • Thumbnail for Avadh Assam Express
    Bathinda Junction RAJASTHAN Sangaria Hanumangarh Pilibanga Suratgarh Lunkaransar Lalgarh Junction. It reverses direction of travel once at; Bathinda Junction...
    13 KB (876 words) - 03:51, 14 March 2024
  • Thumbnail for Udyan Abha Toofan Express
    electrified, a Howrah-based WAP-4 hauled the train from Howrah Junction up to Bathinda Junction handing over to a Ludhiana-based WDM-3A which powered the train...
    6 KB (433 words) - 07:16, 12 July 2023
  • Thumbnail for Delhi–Fazilka line
    Archived from the original (PDF) on 8 May 2014. Retrieved 6 May 2014. "BathindaRewari line route map". India Rail Info. "History of Electrification". IRFCA...
    12 KB (1,077 words) - 08:02, 26 February 2023
  • Thumbnail for Northern Railway zone
    (3 ft 3+3⁄8 in)-wide metre gauge Delhi–Rewari line to Bathinda.[unreliable source?] The BathindaRewari metre-gauge line was converted to 5 ft 6 in (1,676 mm)...
    44 KB (4,075 words) - 03:37, 17 February 2024
  • Thumbnail for Himsagar Express
    lines BathindaRewari line Bathinda–Rajpura line Bikaner–Rewari line Bhanupli–Leh line Chandigarh–Sahnewal line Delhi–Fazilka line Delhi–Kalka line...
    8 KB (512 words) - 14:17, 7 March 2024
  • Thumbnail for Bhanupli–Leh line
    The Bhanupli–Leh line is an under-construction electrified railway track connecting Bhanupli, Punjab, to Leh, Ladakh. Once complete, the 489 km (304 mi)...
    15 KB (1,148 words) - 21:21, 16 April 2024
  • of Jui, north of Badhra - Akoda (spur from upgrade Akoda to Rewari Sh to NH) - existing NH (Mahendragarh-Narnaul to NH148B-NH48 junction) -...
    47 KB (4,852 words) - 15:37, 19 April 2024
  • Thumbnail for Shalimar Express
    Phulera Junction, Jaipur Junction, Bandikui Junction, Alwar Junction, Rewari, Gurgaon, old Delhi, Ghaziabad, Meerut City Junction, Saharanpur, Ambala...
    3 KB (207 words) - 13:39, 3 February 2024
  • was then announced to be submitted in the month of September. A new spur line linking Ayodhya was also proposed. November: Indian Railways received the...
    10 KB (638 words) - 03:09, 16 April 2024
  • The Rewari–Rohtak line is a railway line that connects Rewari and Rohtak in the Indian state of Haryana. Train services on this line started on 8 January...
    7 KB (549 words) - 15:29, 20 February 2024
  • Thumbnail for Kalka–Shimla Railway
    5 ft 6 in (1,676 mm) broad gauge Delhi–Kalka line opened, which made the construction of a branch line up to Shimla feasible. The earliest survey was...
    29 KB (2,445 words) - 06:40, 16 February 2024