Leve Expresso Tiradentes. The project cost is estimated at R$2.3 billion and is estimated to be completed (between Vila Prudente and Tiradentes ) in 2012... 3 KB (237 words) - 18:32, 14 March 2024 |
Ipiranga (CPTM) (section Expresso Tiradentes) were cancelled, including the reconstruction. The project of the Expresso Tiradentes BRT was to connect Ipiranga station with the train station; only... 10 KB (777 words) - 20:15, 2 April 2024 |
Together with the Mercado, Vila Prudente, and Cidade Tiradentes Terminals it forms the Expresso Tiradentes, a corridor exclusively used by buses. The Sacomã... 2 KB (121 words) - 11:04, 12 July 2023 |
and is the terminus. There are plans to integrate the station with Expresso Tiradentes Line 2 (a bus rapid transit system). The Vila Prudente Bus Terminal... 20 KB (971 words) - 14:42, 2 April 2024 |
RioCard (section Express (Expresso)) Real, US Dollar) - X-Rates". x-rates.com. Retrieved 15 May 2015. "RioCard Expresso". www.cartaoriocard.com.br. Archived from the original on 2014-02-28. Retrieved... 10 KB (1,307 words) - 10:12, 25 April 2024 |
to Sacomã Terminal, a large bus terminal that includes access to Expresso Tiradentes as well as municipal and intercity bus lines. "Entrada de Passageiros... 4 KB (70 words) - 19:11, 2 April 2024 |
Paulo implemented in 2007 a bus rapid transit system called the Expresso Tiradentes. There is also a 632 km (393 mi) long system of reserved bus lanes... 18 KB (2,140 words) - 01:39, 13 November 2023 |
of the Line 2-Green until that section. The construction of the Expresso Tiradentes (formerly Fura-Fila), designed in the administration of mayor Celso... 14 KB (1,491 words) - 20:00, 15 February 2024 |
Ipiranga SAC Sacomã Side platforms Underground Sacomã Bus Terminal Expresso Tiradentes Ipiranga TTI Tamanduateí Side platforms Elevated Between Ipiranga... 2 KB (198 words) - 17:11, 12 March 2022 |
Trolleybuses Santos São Paulo BRT Corredor Metropolitano ABD (São Paulo) Expresso Tiradentes (São Paulo) BRT ABC (São Paulo, under construction) RIT (Curitiba)... 6 KB (828 words) - 00:34, 28 January 2021 |
side platforms Underground Sé PDS Pedro II Side platforms Elevated Expresso Tiradentes Sé BAS Brás Island and side platforms Elevated Brás BRE Bresser–Mooca... 7 KB (503 words) - 12:58, 6 October 2023 |
Trolleybuses Santos São Paulo BRT Corredor Metropolitano ABD (São Paulo) Expresso Tiradentes (São Paulo) BRT ABC (São Paulo, under construction) RIT (Curitiba)... 7 KB (601 words) - 10:00, 25 April 2024 |
2-Green would have an extension to Cidade Tiradentes Hospital, in an elevated monorail, replacing Expresso Tiradentes, which was cancelled. The construction... 9 KB (622 words) - 14:51, 2 April 2024 |
Archived from the original on 10 October 2010. Retrieved 15 July 2019. "Expresso Turístico" (in Portuguese). Companhia Paulista de Trens Metropolitanos... 13 KB (1,410 words) - 18:31, 28 February 2024 |
Cruz do Rio Pardo 1956 25 FPF Tanabi Tanabi Elvira Jacareí 1957 26 FPF Expresso São Carlos São Carlos Monte Aprazível Monte Aprazível 1958 27 FPF Nevense... 55 KB (569 words) - 03:46, 29 April 2024 |
Federal district. In 1981 Martim Francesco was coach of Grêmio Esportivo Tiradentes in the Taça de Bronze, the tournament to establish the participant of... 32 KB (4,118 words) - 20:04, 1 November 2023 |
São Paulo Metro and Line 11 of the Metropolitan Train Company (CPTM)'s Expresso Leste network. The area is becoming industrialised and commercial activity... 8 KB (731 words) - 16:01, 4 June 2022 |