Falsework consists of temporary structures used in construction to support a permanent structure until its construction is sufficiently advanced to support...
7 KB (765 words) - 15:39, 13 May 2024
898306°W / 51.439111; -0.898306 The Loddon Bridge disaster was a collapse of falsework during construction of a reinforced concrete deck on the Loddon Bridge...
18 KB (2,390 words) - 08:27, 17 August 2023
compression, so far as is possible. Each arch is constructed over a temporary falsework frame, known as a centring. In the first compression arch bridges, a keystone...
27 KB (2,975 words) - 22:46, 4 January 2024
easily constructed at difficult crossings by virtue of using little or no falsework. Engineers in the 19th century understood that a bridge that was continuous...
12 KB (1,254 words) - 19:19, 16 May 2024
precast or cast-in-place. In the context of concrete construction, the falsework supports the shuttering molds. In specialty applications formwork may...
26 KB (3,437 words) - 10:51, 10 November 2023
to ensure column survival. Falsework fabrication: Metalworkers fabricate a falsework section from pipe and beams. Falsework erection: A section is lifted...
106 KB (12,394 words) - 07:14, 5 May 2024
automobile, truck, light rail, heavy rail Span range Short Material Steel Movable Yes Design effort Medium Falsework required Site and prefabrication specific...
6 KB (498 words) - 00:24, 5 May 2024
Young Galaxy (redirect from Falsework (album))
Galaxy Re-Team with Dan Lissvik for 'Falsework'". exclaim.ca. Retrieved August 4, 2015. "Young Galaxy - Falsework". Discogs. October 30, 2015. Retrieved...
8 KB (699 words) - 05:04, 12 February 2024
2000. If made of concrete, box girder bridges may be cast in place using falsework supports, removed after completion, or in sections if a segmental bridge...
8 KB (875 words) - 03:36, 28 March 2024
The Gagarin Street Bridge [ru] in Arkhangelsk, Russia. Construction falsework on left; force schematic on right Elevation and plan view of single-tower...
7 KB (691 words) - 07:08, 25 April 2024
List of construction methods (section Falsework)
and support the incoming beam. Falsework consists of temporary structures used to support a permanent structure. Falsework need to have accurate calculation...
9 KB (1,162 words) - 01:26, 9 May 2024
"slip-form" construction, where the falsework moves (slips) upward following sequential concrete "pours." The falsework uses the newly constructed concrete...
9 KB (1,129 words) - 12:59, 2 June 2023
act as a cantilever. This is very helpful when temporary supports, or falsework, cannot be used to support the structure while it is being built (e.g...
18 KB (2,120 words) - 22:29, 28 February 2024
and installing cabinets. Formwork carpenter creates the shuttering and falsework used in concrete construction, and reshores as necessary. Framer is a...
27 KB (3,266 words) - 19:30, 2 May 2024
concrete, prestressed concrete, masonry Movable No Design effort medium Falsework required available for use, since viaducts are all composed of low bridges...
9 KB (979 words) - 18:39, 22 April 2024
suspension bridge types, this type often is constructed without the use of falsework. The suspension cables must be anchored at each end of the bridge, since...
43 KB (4,729 words) - 03:24, 14 May 2024
Heavy rail Span range Short Material Timber, iron, steel, reinforced concrete, prestressed concrete Movable No Design effort Low Falsework required No...
10 KB (1,172 words) - 06:51, 18 November 2023
and 200. Carries Pedestrians, Road vehicles, Rail Vehicles Span range Short Material Timber, steel Movable No Design effort Low Falsework required None...
27 KB (2,996 words) - 22:01, 8 May 2024
type was known [1] (demolished Nov. 11-19th 2009) Design effort High Falsework required Depends upon length, materials, and degree of prefabrication...
4 KB (346 words) - 05:03, 1 May 2024
truck, light rail, heavy rail Span range Short Material Steel Movable Yes Design effort medium Falsework required Depends upon degree of prefabrication...
4 KB (420 words) - 17:53, 5 May 2024
with iron fittings and iron rods in tension Movable No Design effort Low Falsework required Determined by enclosed bridge structure, site conditions, and...
21 KB (2,140 words) - 16:00, 4 May 2024
as formwork, panels used to hold concrete in place until it sets, and falsework, which is propping to hold a concrete structure until it sets. Groundworks...
24 KB (3,004 words) - 10:23, 17 May 2024
Span range Short Material Grass or other fiber rope, appropriate decking material Movable No Design effort Advanced for its time Falsework required No...
9 KB (882 words) - 19:35, 5 March 2024
Descendant Arch bridge, trestle bridge Carries footpaths, tracks, roadways Span range Short Material Stone Movable No Design effort Low Falsework required No...
5 KB (442 words) - 13:38, 7 May 2024
range Medium Material structural steel Movable No Design effort Medium Falsework required Sometimes, but long spans are often built using temporary cantilevers...
3 KB (284 words) - 05:15, 22 January 2024
(natural, preexisting), but sometimes supplemented with concrete or asphalt for vehicles. Movable No Design effort None or low Falsework required No...
15 KB (1,751 words) - 04:56, 22 February 2024
water flow and a comfortable step or leap Material Selected stone Movable No Design effort Low-rustic to Artisan applied art design Falsework required No...
5 KB (449 words) - 03:39, 28 April 2024
automobiles, trucks, light rail, heavy rail Span range Short, Medium Material Iron, wood, concrete Movable No Design effort low Falsework required No...
10 KB (1,205 words) - 07:21, 15 March 2023
Concrete-structure and stone-building shoring, in these cases also referred to as falsework, provides temporary support until the concrete becomes hard and achieves...
6 KB (852 words) - 10:32, 1 March 2024
high winds. Some of the falsework timbers were 10 by 10 inches (250 mm × 250 mm). It took two months to construct the falsework alone. When high waves...
57 KB (6,583 words) - 05:25, 4 March 2024