• Thumbnail for IPHWR-700
    The IPHWR-700 (Indian Pressurized Heavy Water Reactor-700) is an Indian pressurized heavy-water reactor designed by the NPCIL. It is a Generation III...
    13 KB (880 words) - 15:07, 16 April 2024
  • Thumbnail for IPHWR
    energy mix to 22,480 MWe. IPHWR-220, first version of the IPHWR class of recators IPHWR-700, Generation III+ successor to the IPHWR-220 design CANDU, predecessor...
    9 KB (866 words) - 03:47, 4 March 2024
  • Thumbnail for IPHWR-220
    small modular reactor due to its modularization. The IPHWR design was later expanded into 540 MW and 700 MW designs, as well as the AHWR-300 design. India's...
    7 KB (283 words) - 12:19, 27 January 2024
  • "Status report 74 – Indian 220 MWe PHWR (IPHWR-220)" (PDF). "Status report 105 – Indian 700 MWe PHWR (IPHWR-700)" (PDF). "В Индии началось сооружение блока...
    73 KB (7,491 words) - 04:49, 3 May 2024
  • "Status report 74 – Indian 220 MWe PHWR (IPHWR-220)" (PDF). "Status report 105 – Indian 700 MWe PHWR (IPHWR-700)" (PDF). "В Индии началось сооружение блока...
    193 KB (2,757 words) - 05:16, 7 May 2024
  • Thumbnail for Kakrapar Atomic Power Station
    Manmohan Singh ministry approved outline plans to build two Indian-designed IPHWR-700 reactors, with two sister reactors a little later at Rajasthan Atomic...
    12 KB (943 words) - 15:06, 16 April 2024
  • employees. Advanced heavy-water reactor BHAVINI Bhabha Atomic Research Centre IPHWR Nuclear power in India "About Us". NPCIL. Retrieved 28 March 2019. "Contact...
    14 KB (499 words) - 06:17, 23 April 2024
  • generate 3500 MW of electricity from nuclear sources. The proposed 700 MW IPHWR-700 reactors are indigenous and similar to the ones currently under construction...
    5 KB (331 words) - 16:41, 6 April 2024
  • heavy water reactor CANDU reactor: The predominant type of PHWR IPHWR-700 and IPHWR-220, PHWR types developed in India List of nuclear reactors Pressurized...
    16 KB (1,994 words) - 18:32, 21 April 2024
  • conditions. The survey was started in December 2012. The proposed 700 MW IPHWR-700 reactors are indigenous and similar to the ones currently under construction...
    5 KB (376 words) - 11:52, 4 April 2024
  • Thumbnail for Kaiga Atomic Power Station
    September 2016 for a record number of 940 days. Two PHWR unit, each with a 700 MW capacity, have been planned for this location. As of February 2017[update]...
    9 KB (598 words) - 16:57, 15 March 2024
  • Thumbnail for India's three-stage nuclear power programme
    MWe, 540 MWe and 700 MWe capacity under the designations IPHWR-220, IPHWR-540 and IPHWR-700 respectively. Indian uranium reserves are capable of generating...
    68 KB (7,446 words) - 18:38, 31 December 2023
  • Thumbnail for Light-water reactor
    Pressurized CANDU CANDU 6 CANDU 9 EC6 AFCR ACR-1000 CVTR IPHWR IPHWR-220 IPHWR-540 IPHWR-700 PHWR KWU MZFR R3 R4 Marviken H2O HWLWR ATR HW BLWR 250 Steam-generating...
    25 KB (3,329 words) - 17:29, 7 April 2024
  • Thumbnail for List of megaprojects in India
    "Kaiga Nuclear Power Plant Expansion". NS energybusiness. "Excavation for two 700 MW nuclear power plants in Karnataka's Kaiga begins". The Print. url=https://pib...
    181 KB (4,821 words) - 17:06, 3 May 2024
  • February 2010, and unit 6 on 31 March 2010. Two of the new Indian-designed 700 MWe series of the reactor (RAPP-7 and RAPP-8) are under construction in Rajasthan...
    12 KB (779 words) - 07:58, 8 April 2024
  • Thumbnail for Arihant-class submarine
    Stage I - PHWR IPHWR IPHWR-220 IPHWR-540 IPHWR-700 Stage II - FBR PFBR FBR-600 Stage III - Thorium AHWR-300...
    44 KB (2,965 words) - 18:51, 25 April 2024
  • Thumbnail for Gorakhpur Nuclear Power Plant
    pre-project activities had been carried out for units 3 and 4. The proposed 700 MW IPHWR-700 pressurized heavy water reactors are indigenous and similar to the...
    10 KB (774 words) - 07:52, 5 February 2024
  • Pressurized CANDU CANDU 6 CANDU 9 EC6 AFCR ACR-1000 CVTR IPHWR IPHWR-220 IPHWR-540 IPHWR-700 PHWR KWU MZFR R3 R4 Marviken H2O HWLWR ATR HW BLWR 250 Steam-generating...
    1 KB (140 words) - 02:07, 16 February 2024
  • commonality of majority of non-nuclear island components of the design with the IPHWR-700 pressurized heavy-water reactors currently in use to limit design timelines...
    10 KB (853 words) - 08:49, 25 April 2024
  • Pressurized CANDU CANDU 6 CANDU 9 EC6 AFCR ACR-1000 CVTR IPHWR IPHWR-220 IPHWR-540 IPHWR-700 PHWR KWU MZFR R3 R4 Marviken H2O HWLWR ATR HW BLWR 250 Steam-generating...
    17 KB (1,546 words) - 00:31, 7 November 2023
  • Thumbnail for Boiling water reactor
    Pressurized CANDU CANDU 6 CANDU 9 EC6 AFCR ACR-1000 CVTR IPHWR IPHWR-220 IPHWR-540 IPHWR-700 PHWR KWU MZFR R3 R4 Marviken H2O HWLWR ATR HW BLWR 250 Steam-generating...
    52 KB (7,179 words) - 19:13, 9 February 2024
  • Thumbnail for TMSR-LF1
    New reactor specifications include: core graphite 3 m tall x 2.2 m wide, 700 °C operating temperature, 60 MW thermal output, and an experimental supercritical...
    15 KB (1,543 words) - 13:31, 8 April 2024
  • Stage I - PHWR IPHWR IPHWR-220 IPHWR-540 IPHWR-700 Stage II - FBR PFBR FBR-600 Stage III - Thorium AHWR-300...
    6 KB (338 words) - 05:03, 30 April 2024
  • Thumbnail for Pressurized water reactor
    Pressurized CANDU CANDU 6 CANDU 9 EC6 AFCR ACR-1000 CVTR IPHWR IPHWR-220 IPHWR-540 IPHWR-700 PHWR KWU MZFR R3 R4 Marviken H2O HWLWR ATR HW BLWR 250 Steam-generating...
    33 KB (4,267 words) - 23:06, 31 March 2024
  • Thumbnail for Economy of India
    An IPHWR-700 reactor undergoing construction in Kakrapar Nuclear Plant started in 1984...
    287 KB (23,570 words) - 01:29, 7 May 2024
  • Thumbnail for Fast-neutron reactor
    Pressurized CANDU CANDU 6 CANDU 9 EC6 AFCR ACR-1000 CVTR IPHWR IPHWR-220 IPHWR-540 IPHWR-700 PHWR KWU MZFR R3 R4 Marviken H2O HWLWR ATR HW BLWR 250 Steam-generating...
    55 KB (7,479 words) - 11:12, 6 May 2024
  • Thumbnail for Generation III reactor
    First units under construction at Kursk Nuclear Power Plant. BARC IPHWR-700 PHWR 630 700 2166 2021-1-10 Kakrapar Successor of indigenous 540MWe PHWR with...
    33 KB (1,700 words) - 01:04, 2 May 2024
  • Thumbnail for CANDU reactor
    a design known as the ACR-700, using elements of the latest versions of the CANDU 6 and CANDU 9, with a design power of 700 MWe. During the nuclear renaissance...
    76 KB (9,599 words) - 08:23, 18 April 2024
  • Thumbnail for EPR (nuclear reactor)
    Pressurized CANDU CANDU 6 CANDU 9 EC6 AFCR ACR-1000 CVTR IPHWR IPHWR-220 IPHWR-540 IPHWR-700 PHWR KWU MZFR R3 R4 Marviken H2O HWLWR ATR HW BLWR 250 Steam-generating...
    97 KB (9,301 words) - 02:14, 18 April 2024
  • Pressurized CANDU CANDU 6 CANDU 9 EC6 AFCR ACR-1000 CVTR IPHWR IPHWR-220 IPHWR-540 IPHWR-700 PHWR KWU MZFR R3 R4 Marviken H2O HWLWR ATR HW BLWR 250 Steam-generating...
    18 KB (2,121 words) - 01:37, 30 April 2024