• Thumbnail for LVM3
    The Launch Vehicle Mark-3 or LVM3 (previously referred as the Geosynchronous Satellite Launch Vehicle Mark III or GSLV Mk III) is a three-stage medium-lift...
    82 KB (5,901 words) - 06:31, 11 May 2024
  • and LVM3. This family of three launchers was previously being designed for replacing the different core propulsion modules of PSLV, GSLV, and LVM3 respectively...
    14 KB (1,316 words) - 02:31, 22 April 2024
  • Thumbnail for Vikas (rocket engine)
    and also the core stage of LVM3. The propellant loading for Vikas engine in PSLV, GSLV Mark I and II is 40 tons, while in LVM3 is 55 tons. In 1974, Societe...
    9 KB (599 words) - 06:15, 7 May 2024
  • Thumbnail for Gaganyaan
    descending from a height of 635 km. A module prototype was launched onboard LVM3 in 2014. At 126 kilometers above the ground, it broke apart, descending 80...
    93 KB (8,739 words) - 18:05, 21 April 2024
  • Thumbnail for Indian Human Spaceflight Programme
    plans to launch its crewed orbiter Gaganyaan atop a Launch Vehicle Mark 3 (LVM3). About 16 minutes after lift-off, the rocket will inject the orbital vehicle...
    60 KB (5,662 words) - 02:28, 24 April 2024
  • Thumbnail for Bharatiya Antariksha Station
    December 2023, the first module is expected to be launched in 2028 on an LVM3 launch vehicle, with the remaining modules to be launched by 2035 on the...
    21 KB (1,744 words) - 23:41, 10 May 2024
  • Thumbnail for Satish Dhawan Space Centre
    Polar Satellite Launch Vehicle, Geosynchronous Satellite Launch Vehicle, LVM3 and is intended for India's first crewed space mission. The first launch...
    39 KB (3,867 words) - 02:00, 7 May 2024
  • Thumbnail for CE-20
    Organisation (ISRO). It has been developed to power the upper stage of the LVM3. It is the first Indian cryogenic engine to feature a gas-generator cycle...
    27 KB (2,322 words) - 19:54, 26 March 2024
  • Thumbnail for Human Space Flight Centre
    Gaganyaan project. The first crewed flight is planned for 2024 on a home-grown LVM3 rocket. Before Gaganyaan mission announcement in August 2018, human spaceflight...
    28 KB (2,554 words) - 15:13, 25 April 2024
  • Thumbnail for Chandrayaan-3
    July 2019, ISRO launched Chandrayaan-2 on board a Launch Vehicle Mark-3 (LVM3) launch vehicle consisting of an orbiter, a lander and a rover. The lander...
    86 KB (6,794 words) - 03:40, 13 May 2024
  • Soviet surface-to-air missile system S200, solid rocket booster of Indian LVM3 SIPA S.200 Minijet, a 1950s French trainer light jet aircraft Polish railways...
    787 bytes (139 words) - 00:19, 24 February 2024
  • Thumbnail for Chandrayaan programme
    Mk-II with Chandrayaan-2 payload, hence a more capable and already flown LVM3 vehicle was chosen. During a landing test in February 2019, the lander suffered...
    97 KB (9,211 words) - 10:00, 9 May 2024
  • Thumbnail for Gaganyaan-4
    2023, it is expected to be launched by 2025. The Launch Vehicle Mark-3 or LVM3 (previously referred as the Geosynchronous Satellite Launch Vehicle Mark...
    8 KB (1,502 words) - 17:54, 7 April 2024
  • Thumbnail for 2024 in spaceflight
    10 20 30 40 50 Atlas Electron Falcon GSLV H-series Kuaizhou Long March LVM3 PSLV R-7 Vega Vulcan Others   Atlas V   Electron   Falcon 9 new   Falcon...
    86 KB (4,529 words) - 02:15, 13 May 2024
  • Thumbnail for SCE-200
    thrust class liquid rocket engine, being developed to power ISRO's existing LVM3 and upcoming heavy and super heavy-lift launch vehicles. It is being developed...
    19 KB (1,603 words) - 17:09, 7 May 2024
  • Thumbnail for ISRO
    sixth country to have full launch capabilities. A new heavier-lift launcher LVM3 was introduced in 2014 for heavier satellites and future human space missions...
    235 KB (17,953 words) - 22:57, 12 May 2024
  • Thumbnail for Cryogenic rocket engine
    are numerous. Boosters include ESA's Ariane 5, JAXA's H-II, ISRO's GSLV, LVM3, United States Delta IV and Space Launch System. The United States, Russia...
    12 KB (614 words) - 06:17, 8 May 2024
  • Thumbnail for Eutelsat OneWeb
    resumed in quarter four of 2022 using the SpaceX Falcon 9 and the Indian LVM3 rockets. The satellites in the OneWeb constellation are approximately 150 kg...
    83 KB (7,347 words) - 12:42, 17 April 2024
  • on 28 October 2014. The proposed launch vehicle for this campaign is the LVM3, which flew for the first time on 5 June 2017, and might be powerful enough...
    18 KB (1,359 words) - 14:21, 3 April 2024
  • to land on moon South pole of India.Chandrayaan-3 was launched aboard an LVM3-M4 rocket on 14 July 2023, at 09:05 UTC from Satish Dhawan Space Centre Second...
    7 KB (924 words) - 16:19, 4 May 2024
  • Thumbnail for Vikram Sarabhai Space Centre
    rockets, the Rohini and Menaka launchers, and SLV, ASLV, PSLV, GSLV and LVM3 families of launch vehicles. The space centre is the largest among the ISRO...
    15 KB (1,575 words) - 16:12, 24 April 2024
  • Thumbnail for Pragyan (Chandrayaan-3)
    longer operation time than planned. Chandrayaan-3 was launched aboard an LVM3-M4 rocket on 14 July 2023, at 09:05 UTC from Satish Dhawan Space Centre Second...
    23 KB (2,069 words) - 16:59, 21 April 2024
  • Thumbnail for Gas-generator cycle
    flown. CE-20—Indian LH2/LOX engine developed in the 2010s for use on the LVM3 launch vehicle. YF-20—Chinese N2O4/UDMH engine developed in the 1990s and...
    5 KB (491 words) - 02:15, 15 March 2024
  • Sreedhara Panicker; N. Narayanamoorthy; S. Ramakrishnan (2010). "GSLV Mk-III (LVM3) Development Challenges and Present Status" (PDF). International Astronautical...
    3 KB (183 words) - 18:32, 23 April 2024
  • ISRO's launch vehicles. Left to right: SLV, ASLV, PSLV, GSLV, LVM3...
    33 KB (2,310 words) - 02:41, 8 May 2024
  • launches. The Propulsion-Descender-Ascender Composite will be launched over an LVM3 and among which the Descender Module with the Ascender Module attached intact...
    15 KB (1,389 words) - 00:36, 6 May 2024
  • The CE-20 will power the upper stage of the human-rated version of the LVM3 (formerly known as GSLV Mk III) launch vehicle. Each private spaceflight...
    7 KB (828 words) - 16:25, 22 April 2024
  • Thumbnail for Polar Satellite Launch Vehicle
    Rocketry portal Spaceflight portal Geosynchronous Satellite Launch Vehicle LVM3 Next Generation Launch Vehicle Comparison of orbital launchers families Medium-lift...
    66 KB (5,553 words) - 09:55, 13 May 2024
  • Interplanetary Missions and Reusability". Rocket Lab. Retrieved October 26, 2020. "LVM3". Archived from the original on September 10, 2015. Retrieved December 21...
    78 KB (1,971 words) - 17:22, 7 April 2024
  • Thumbnail for Geosynchronous Satellite Launch Vehicle
    of orbital launchers families Comparison of orbital launch systems PSLV LVM3 NGLV ISRO ASLV SLV "GAO". "Geosynchronous Satellite Launch Vehicle". Archived...
    25 KB (1,800 words) - 14:18, 29 April 2024