Siemens Gamesa (redirect from Danregn Vindkraft) wind activities were separated into newly established company Danregn Vindkraft A/S, established by Peter Stubkjær Sørensen and Egon Kristensen in Brande... 49 KB (4,138 words) - 11:24, 28 February 2024 |
(1980–1997) — merged with Micon in 1997 Siemens Wind Power — formerly Danregn Vindkraft and then Bonus Energy A/S between 1980 and takeover in 2004 Vestas (1979–present)... 989 bytes (87 words) - 19:58, 9 February 2024 |
NTB (2019-10-24). "Organisasjonen Motvind Norge samler motstandere av vindkraft" [The organization Motvind Norge brings together opponents of wind power]... 6 KB (594 words) - 23:54, 21 November 2023 |
wind turbines. The developer and operator of the wind farm is Storrun Vindkraft AB, a joint venture of Ørsted A/S (80%) and Borevind AB (20%). The wind... 2 KB (194 words) - 23:14, 15 March 2024 |
2015-11-02. Baltscheffsky, Susanna (2008-05-26). "Fler elbilar kräver mer vindkraft". Svenska dagbladet (in Swedish). Stockholm. Retrieved 2009-03-30. Berglund... 13 KB (258 words) - 02:37, 22 August 2022 |
wind farms in Sweden Rothberg, Ole; Andersson, Mikael (2007-12-22). "Het vindkraft sätter snurr på det gamla varvet". Dagens nyheter (in Swedish). Stockholm... 3 KB (226 words) - 02:29, 6 March 2024 |
Industry), and in 2006 it was 10.3%, not 17%. Translation of "Analyse af Vindkraft i Dansk Elforsyning 2005 og 2006", Summary. Sharman, Hugh (May 2005).... 79 KB (6,924 words) - 05:08, 7 March 2024 |
Machine Sandbag UK 18.9.2019 EU på väg att lämna kolkraften – Allt mer vindkraft och solenergi i stället Vasabladet 18.9.2019 Abnett, Kate (2022-07-06)... 106 KB (13,682 words) - 14:53, 1 May 2024 |
Construction began 2008 Commission date 2010 Owner(s) HgCapital (75%) Nordisk Vindkraft (25%) Wind farm Rotor diameter 90 m (300 ft) Power generation Units operational... 2 KB (93 words) - 13:36, 13 April 2024 |
lokke internasjonale konkurrenter til nytt norsk testsenter for flyvende vindkraft". Teknisk Ukeblad. Retrieved 23 September 2017. The Aeropleustic Art Archived... 27 KB (3,348 words) - 17:19, 13 February 2024 |
on offshore wind". WindEurope. Retrieved 2024-04-12. "Motståndet mot vindkraft växer". Archived from the original on 2013-03-10. Retrieved 2012-05-01... 10 KB (775 words) - 09:32, 12 April 2024 |
Retrieved 28 October 2015. Olsson, Magdalena (30 October 2008). "Samråd om vindkraft på Mästermyr" [Consultation about wind power on Mästermyr]. www.helagotland... 5 KB (521 words) - 23:44, 15 October 2023 |
CleanIndex, retrieved 26 September 2011. Lars Anders Karlberg, "TV: Vindkraft med svänghjul ger mer el", NyTeknik 9 September 2011, retrieved 27 September... 5 KB (482 words) - 19:15, 24 August 2023 |
Energy, Siemens Wind Power, University of Southern Denmark, Vattenfall Vindkraft and Vestas Wind Systems. In December 2014 DONG Energy ordered 32 Vestas... 11 KB (1,182 words) - 14:27, 24 April 2024 |
had been generally favorable. Informationsblad vindkraft på Bergön, p. 1. Informationsblad vindkraft på Bergön, p. 2. Nilsson 2010. Bergön: bottenviken... 8 KB (735 words) - 00:21, 6 October 2023 |
by Nord-Trøndelag Elektrisitetsverk. It was decommissioned in 2015. "Vindkraft" (in Norwegian). NTE. Retrieved 2011-10-03. Norway portal Weather portal... 2 KB (119 words) - 04:26, 9 November 2023 |
Salten. It also owns 58% of Rødøy-Lurøy Kraftverk and 60% of Nord-Norsk Vindkraft and part of Fauske Lysverk. SKS was founded in 1956 by the municipalities... 3 KB (304 words) - 20:54, 8 April 2021 |
Archived 2005-01-28 at the Wayback Machine Länstidningen i Östersund Archived 2005-11-11 at the Wayback Machine Driftuppföljning vindkraft v t e v t e... 2 KB (119 words) - 14:46, 17 March 2024 |
portal List of wind farms in Sweden Ståhl, Michael (2007-04-18). "Kraftlös vindkraft i Stora Istad" (in Swedish). Ölandsbladet. Retrieved 2007-12-26. Istad... 4 KB (335 words) - 01:17, 13 April 2021 |