rail Warsaw Cross-City Line, 2.31 km, rail Warsaw, road city tunnel (Wisłostrada), 930 m southbound, 889 m northbound Gdańsk, road under water tunnel... 16 KB (1,797 words) - 12:57, 27 January 2024 |
construction. At the bridgeheads interchanges were constructed with the Wisłostrada on the left bank and Wał Miedzyszyński on the right one. Between 1981... 4 KB (454 words) - 22:29, 19 December 2023 |
was separated from the carriageway and the bridge was connected to the Wisłostrada expressway on the left bank of the Vistula by means of a long looping... 8 KB (772 words) - 17:54, 7 January 2023 |
Warsaw (the two others being the Warszawa Centralna railway station and Wisłostrada route). It was extended in the 1990s. It has been subject to various... 5 KB (451 words) - 20:27, 25 March 2024 |