File:USS John F. Kennedy (CVN-79) in drydock at Newport News Shipbuilding, Virginia (USA) on 29 October 2019 (191029-N-BD319-110).JPG

Original file(6,000 × 4,000 pixels, file size: 1.78 MB, MIME type: image/jpeg)

Summary

Description
English: The U.S. Navy aircraft carrier USS John F. Kennedy (CVN-79) reached another construction milestone on 29 October 2019, as its dry dock area was flooded three months ahead of its slated production schedule, leading up to the christening of the second Ford-class aircraft carrier on 7 December 2019. The flooding of the dry dock followed other milestones, including the laying of the ship's keel on 22 August 2015, the placement of the 588-metric ton island superstructure on 29 May 2019, and the arrival of her crew on 1 October 2019. John F. Kennedy was constructed at Huntington Ingalls Industries-Newport News Shipbuilding, Newport News, Virginia (USA).
Date Taken on 29 October 2019
Source

This image was released by the United States Navy with the ID 191029-N-BD319-110 (next).
This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.


العربية  বাংলা  Deutsch  Deutsch (Sie-Form)  English  español  euskara  فارسی  français  italiano  日本語  한국어  македонски  മലയാളം  Plattdüütsch  Nederlands  polski  پښتو  português  русский  slovenščina  svenska  Türkçe  українська  简体中文  繁體中文  +/−

Author U.S. Navy photo by Mass Communication Specialist 3rd Class Adam Ferrero

Licensing

Public domain
This file is a work of a sailor or employee of the U.S. Navy, taken or made as part of that person's official duties. As a work of the U.S. federal government, it is in the public domain in the United States.

Captions

Add a one-line explanation of what this file represents

Items portrayed in this file

depicts

29 October 2019

0.00625 second

24 millimetre

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current22:47, 29 October 2019Thumbnail for version as of 22:47, 29 October 20196,000 × 4,000 (1.78 MB)Cobatfor== {{int:filedesc}} == {{Information |description={{en|1=The U.S. Navy aircraft carrier USS ''John F. Kennedy'' (CVN-79) reached another construction milestoneon 29 October 2019, as its dry dock area was flooded three months ahead of its slated production schedule leading up to the christening of the second ''Ford''-class aircraft carrier, scheduled for 7 December 2019. The flooding of the dry dock followed other milestones, including the laying of the ship's keel on 22 August 2015, the place...
The following pages on the English Wikipedia use this file (pages on other projects are not listed):

Global file usage

Metadata