Line 5 (Ningbo Rail Transit)
Line 5 | |||
---|---|---|---|
![]() | |||
![]() Train entering the platform of International Convention and Exhibition Center station | |||
Overview | |||
Status | Operational | ||
Owner | Ningbo | ||
Locale | Ningbo, Zhejiang, China | ||
Termini | |||
Stations | 27 | ||
Service | |||
Type | Rapid transit | ||
System | Ningbo Rail Transit | ||
Operator(s) | Ningbo Rail Transit Co., Ltd. | ||
History | |||
Opened | 28 December 2021 | ||
Technical | |||
Line length | 36.6 km (22.74 mi) | ||
Number of tracks | 2 | ||
Character | Underground | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
|
Line 5 of Ningbo Rail Transit (Chinese: 宁波轨道交通5号线) is a rapid transit line in Ningbo. It starts from west Yinzhou District and ends in Luotuo Bridge Station in Zhenhai District. In the future extension plan, the line will extend and become a loop.[1]
The construction of the first section started on 28 September 2016.[2] The line uses GoA4 fully automated trains.[3][4] It is 27.9 km (17.3 mi) in length with 22 stations.[5] The line opened on 28 December 2021.[5]
Phase 2 of line 3 will have 5 more stations north of Datong Bridge, but due to restrictions of an old airport, part of the phase 2 between Datong Bridge and Yongmao Road is stalled for construction.[6] The rest 3 stations of phase 2 has started construction since 2 December 2019,[7] and will temporary run as a part of line 5. Test run of phase 2 of line 3 started in 1 February 2024.[8]
Route
[edit]Phase 1 of Line 5 starts from Buzheng Station in western Yinzhou District as an underground line. Then it goes along Yinxian Road and passes the Fenghua River until it reaches Xiaying and turns north. Then the line goes along first Haiyan Road and then Yuanshi Road. Then the line passes the Yong River and reaches its destination, Xingzhuang Road Station.[9]
Opening timeline
[edit]Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Buzheng — Xingzhuang Road | 28 December 2021 | 27.6 km (17.15 mi) | 22 | Phase 1 |
Xingzhuang Road — Meiyan | 28 June 2024[10] | 2 | Part constructed together with Phase 2 of Line 3 | |
Meiyan — Luotuo Bridge | 28 June 2024[10] | 3 | Phase 2 of Line 3, now temporarily run as a part of Line 5 |
Stations
[edit]Station name | Connections | Location | |
---|---|---|---|
English | Chinese | ||
Buzheng | 布政 | Haishu | |
Zhangjiatan | 张家潭 | ||
Tongde Road | 同德路 | ||
Shiqi | 石碶 | 2 | |
Yadu | 雅渡 | ||
Miaoyan | 庙堰 | 8 | Yinzhou |
Zhonggongmiao | 钟公庙 | ||
Yinzhou Government | 鄞州区政府 | 3 | |
Qianhu South Road | 钱湖南路 | ||
South Higher Education Park | 南高教园区 | 4 | |
Xiaying Road | 下应路 | ||
Dayangjiang | 大洋江 | ||
Sigang | 泗港 | ||
Caoga | 曹隘 | ||
Liuga | 柳隘 | ||
Haiyan North Road | 海晏北路 | 1 | |
Min'an East Road | 民安东路 | 7 | |
International Convention and Exhibition Center | 会展中心 | ||
Yuanshi Road | 院士路 | 6 | |
Angmenggang | 盎孟港 | ||
Sanguantang | 三官堂 | 2 | Jiangbei |
Xingzhuang Road | 兴庄路 | Zhenhai | |
Xinghai South Road | 兴海南路 | ||
Meiyan | 梅堰 | 10 | Jiangbei |
↓ Phase 2 of Line 3, now temporarily run as a part of Line 5 | |||
Yongmao Road | 永茂路 | Zhenhai | |
Zhenhai Avenue (Cihai) | 镇海大道(慈海) | 7 | |
Luotuo Bridge | 骆驼桥 | ||
References
[edit]- ^ "宁波市轨道交通5号线工程可行性研究及相关专题研究(其他)招标公告". Ningbo Development and Reform Council. 2011-04-15. Archived from the original on 2014-03-14. Retrieved 2012-03-21.
- ^ "地铁5号线一期今天上午开工!工期5年" (in Chinese). 甬派客户端. 2016-09-28. Retrieved 2016-09-28.
- ^ "宁波轨道交通5号线一期12月28日10点开通运营". www.bl.gov.cn. Retrieved 2021-12-30.
- ^ 魏诗瑶, 蔡玲玲. "捷报传来!中控信息中标宁波轨道交通5号线全自动运行系统项目". WeChat Official Accounts Platform. Retrieved 2020-05-19.
- ^ a b "宁波轨道交通5号线一期12月28日10点开通运营".
- ^ 宁波轨道交通 (2018-05-17). "宁波市轨道交通3号线二期工程规划选址公示". 宁波市规划局. Archived from the original on 2018-11-05. Retrieved 2018-11-05.
- ^ 范洪 (2019-12-03). "宁波轨道交通3号线二期开工". 现代金报. Archived from the original on 2020-09-23. Retrieved 2019-12-04.
- ^ 宁波轨道交通 (2024-02-04). "宁波轨道交通新线保通进行时". 微信公众平台. Archived from the original on 2024-02-04. Retrieved 2024-02-04.
- ^ Ningbo Environment Protection Design Group, Environment impact report of Line 5, Ningbo Rail Transit, Ningbo, January, 2016
- ^ a b "宁波轨道交通3号线二期6月28日开通 与5号线贯通运营". 中国宁波网. 2024-06-25. Retrieved 2024-06-25.