Tehran Metro Line 6

Tehran Metro Line 6
Overview
Native nameخط ۶ مترو تهران
OwnerTehran Urban and Suburban Railways Organization (Metro)
LocaleTehran, Tehran Province
Termini
Stations24
Service
TypeCommuter rail
SystemTehran Metro
Operator(s)Tehran Urban and Suburban Railways Organization (Metro)
Depot(s)Dowlat Abad Depot
History
OpenedApril 7, 2019[1]
Technical
Line length32.5 km (20.2 mi)[2]
Track gauge1,435 mm (4 ft 8+12 in)
Electrification25 kV AC overhead catenary
Route map

Line 6 is pink coloured on system maps.[3] An initial 9-kilometer-long (5.6 mi) section between Shohada Square to Dowlat Abad opened on April 7, 2019.[4][5] This line is 16.5 km (10.3 mi) long with 24 stations right now. When completed, this line will be 38 km (24 mi) long with 31 stations, connecting southeast Tehran to northwest.[4]

Route

[edit]

Map

References

[edit]
  1. ^ ویدئو / مراسم افتتاح سه طرح بزرگ شهرداری تهران, ISNA
  2. ^ "Tehran Metro Line 6 Opens". Archived from the original on 24 February 2020. Retrieved 2019-04-07.
  3. ^ "خط 5 مترو". tehranmetrogroup.com (in Persian). Archived from the original on 2015-12-08. Retrieved 2015-11-08.
  4. ^ a b "Tehran Metro Line 6 Opens". 2019-04-07. Archived from the original on 2019-04-08. Retrieved 2019-04-08.
  5. ^ "Tehran metro line 6 partially inaugurated". Tehran Times. 2019-04-07. Archived from the original on 19 May 2022. Retrieved 2023-05-27.